Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Foran <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: ELDS <br /> Sump/UDC ID 87 STP 91 STP 87 Fill 91 Fill <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10.10 9:32 11:22 11:58 <br /> Initial Reading 2.3270 1.0078 1.1337 4.0353 <br /> Test End Time 10:25 9.47 11:37 12:13 <br /> Final Reading 2.3269 1.0078 1.1336 4.0353 <br /> Change in Reading 0.00010 0.00009 0.00011 0.00009 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC 112 UDC 314 UDC 516 UDC 718 <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:54 12:54 1:14 1:14 <br /> Initial Reading 3.7292 3.9998 1.2862 0.5020 <br /> Test End Time 1:10 1:10 1:29 1:29 <br /> Final Reading 3.7285 3.9997 1.2859 0.5019 <br /> Change in Reading 0.00072 0.00010 0.00034 0.00013 <br /> Pass ail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />