My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:42:35 PM
Creation date
1/8/2021 4:16:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: <br /> Sump/UDC ID UDC 9110 UDC 11112 <br /> Sump Manufacturer j <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 1:39 1:39 <br /> Initial Reading 4.8929 0.2150 <br /> Test End Time 1:54 1:54 <br /> Final Reading 4.8939 0.2149 <br /> Change in Reading 0.00102 0.00017 <br /> Pass/Fail Criteria 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass ail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ® Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.