My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 10:39:23 AM
Creation date
1/11/2021 1:05:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Froulat) Sej-e,,s <br /> k-vtk� UXA-c,- loo Uwuo r— C-I <br /> Maintenance Inspecting/Verifying 95% Level (Without <br /> The 708-5100 Series Overfill Prevention Valve has no Removing from Tank) <br /> periodic maintenance requirements. FOR DIMENSIONS"A" &"B": Refer to the "installation <br /> However, if the drop tube and valve assembly is removed record sheet" or re-measure and re-calculate per figure 1 <br /> from the tank (for inspection or service), inspect the 1. Measure Dimension "Z" (Figure 18) <br /> drop tube seal for wear/darnage (Figure 161. Replace if <br /> necessary. sr (Upper drop tube flange to -4 <br /> —] edge of upper tube adapter) <br /> 2. Verify using the calculation below <br /> "A (Drop tube seal surface to <br /> 5 <br /> bottom of tank) <br /> ar <br /> " F ) LI <br /> (Subtract) <br /> Drop (95%Volume from tank chart) <br /> Tube Gasket Installed <br /> orientation) <br /> (Subtract) <br /> F4-5*' (114rn (95%Shutoff level offset) <br /> Figure 16:Inspect Gasket (Equals) <br /> Additionally, if the upper or lower drop tube is <br /> unthreaded/removed from the OPV,the O-ring(s)should <br /> be replaced (Figure 17). lJC1 --�— Sarneyal�ueas <br /> indicates correct installation <br /> Inspect 0-ring P. <br /> Measure <br /> ilzl$ <br /> 4112. <br /> (114 mm) <br /> Inspect 0-ring <br /> Figure 17:Inpect O-Rings Figure 18:Dimension Verification After Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.