My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 10:39:23 AM
Creation date
1/11/2021 1:05:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Wff) Fiwlw5- OeAo&r ifs � <br /> wG � 1ocD LQu0rZ. 8� <br /> Maintenance Inspecting/Verifying 55% Level (Without <br /> The 708-590 Series Overfill Prevention Valve has no Removing from Tank) <br /> periodic maintenance requirements FOR DIMENSIONS "A" & °B": Refer to the"installation <br /> However, if the drop tube and valve assembly is removed record sheet"or re-measure and re-calculate per figure 1. <br /> from the tank(for inspection or service), inspect the <br /> drop tube seal for wear/damage (Figure 16). Replace if 1. Measure Dimension "Z" (Figure 18) <br /> necessary <br /> :,Z„ (Upper drop tube flange to <br /> 57 <br /> edge of upper tube adapter) <br /> 2. Vgrify using the calculation below <br /> 159 (Drop tube seal surface to <br /> bottom of tank) <br /> -(Subtract) <br /> Drop Tube Gasket installed <br /> (note orientation) "B � (95%Volume from lank chart) <br /> r Z <br /> I l.� <br /> (Subtract) <br /> „ 95%Shutoff level offset <br /> 4.5 (114mm) { ) <br /> Figure 1S:Inspect Gasket <br /> _ <br /> Additionally, if the upper or lower drop tube is (Equals) <br /> unthreaded I removed from the OPV,the O-ring(s)should - <br /> — <br /> be replaced (Figure 17). t Same value as "Z" <br /> indicates correct installation <br /> Inspect 0-ring—► _, <br /> J <br /> i <br /> Measure <br /> f <br /> (114 mm) <br /> t, <br /> Inspect O-ring- a► .-_ j t l <br /> Figure 17:Inpect O l?ings Figure 18:Dimension Verification After Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.