My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:40:34 AM
Creation date
1/12/2021 8:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MFS Response to Hazardous Material Violations: <br />PR0543520-1325 EI Pinal-Compliance-8-3-21 OIR <br />Page 5 of 8 <br />ons section 66265.15 <br />(a) The owner or operator shall inspect the facility for malfunctions and deterioration, operator <br />errors, and discharges which may be causing or may lead to: (1) release of hazardous waste <br />constituents to the environment; or (2) a threat to human health. The owner or operator shall <br />conduct these inspections often enough to identify problems in time to correct them before <br />they harm human health or the environment. <br />(b)(1) The owner or operator shall develop and follow a written schedule for inspecting all <br />monitoring equipment, safety and emergency equipment, security devices, and operating and <br />structural equipment (such as dikes and sump pumps) that are important to preventing, <br />detecting, or responding to environmental or human health hazards. <br />(2) The owner or operator shall keep this schedule at the facility. <br />(3) The schedule shall identify the types of problems (e.g., malfunctions or deterioration) <br />which are to be looked for during the inspection (e.g., inoperative sump pump, leaking fitting, <br />eroding dike, etc.). <br />(4) The frequency of inspection may vary for the items on the schedule. However, it should <br />be based on the rate of possible deterioration of the equipment and the probability of an <br />environmental or human health incident if the deterioration, or malfunction, or any operator <br />error goes undetected between inspections. Areas subject to spills, such as loading and <br />unloading areas, shall be inspected daily when in use. At a minimum, the inspection schedule <br />shall include the items and frequencies called for in sections 66265.174, 66265.193, 66265.195, <br />66265.226, 66265.260, 66265.278, 66265.304, 66265.347, 66265.377, 66265.403, 66265.1033, <br />66265.1052, 66265.1053, 66265.1058, 66265.1084 through 66265.1090 of this chapter, where <br />applicable. <br />(c) The owner or operator shall remedy any deterioration or malfunction of equipment or <br />structures which the inspection reveals on a schedule which ensures that the problem does not <br />lead to an environmental or human health hazard. Where a hazard is imminent or has already <br />occurred, remedial action shall be taken immediately. <br />(d) The owner or operator shall record inspections in an inspection log or summary. The <br />owner or operator shall keep these records for at least three years from the date of inspection. <br />At a minimum, these records shall include the date and time of the inspection, the name of the <br />inspector, a notation of the OBSERVATIONS made, and the date and nature of any repairs or <br />other remedial actions. <br />CORRECTIVE ACTION: Provide a CORRECTIVE ACTION statement and supporting documentation <br />to the EHD within 30 days. <br />This is a repeat violation, Class II. <br />Metal Finishing Solutions (MFS) Response: <br />
The URL can be used to link to this page
Your browser does not support the video tag.