My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:40:34 AM
Creation date
1/12/2021 8:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MFS Response to Hazardous Material Violations: <br />PR0543520-1325 EI Pinal-Compliance-8-3-21 OIR <br />Page 6 of 8 <br />MFS has copies of "Hazardous Waste Tank System — Daily Inspection Log(s)" available for review <br />for January — July 2021. These inspection forms should have been available to the Inspector <br />during the July 20, 2021 SJC-EHD Inspection. <br />203. CCR 67450.3(c)(9)(F) Failed to have a complete new hazardous waste tank system <br />assessment. <br />OBSERVATION: This hazardous waste treatment facility has hazardous waste tanks with incomplete <br />tank assessments. <br />The PE Certification statement is incomplete. Statement is missing "be" in "...to be the best <br />of... <br />- Capacity of secondary containment, seismic calculations, wall thickness determination <br />method, tank tightness test results, piping diameter and description of pumps are missing from <br />the tank assessments for the 1500 gallon acid waste tank, 1500 gallon alkaline waste tank, 1000 <br />gallon neutralization tank 1 and 1000 gallon neutralization tank 2. Note: This violation was noted <br />in the 8/31/2020 inspection report and has not been corrected. <br />CORRECTIVE ACTION: Have a qualified Professional Engineer update the tank assessment and <br />add the missing sections. Provide a CORRECTIVE ACTION statement and supporting <br />documentation to the San Joaquin County Environmental Health Department (EHD) within 30 <br />days. Provide a copy of the updated assessment, when available. <br />Metal Finishing Solutions (MFS) Response: <br />As mention above in item #2, MFS has received an updated a Waste Tank System Integrity <br />Report by Morris Shaffer Engineering in August 24, 2021. <br />Note that Morris Shaffer Engineering have since update their Waste Tank System Integrity Report and <br />MFS will submit this update for SJC-EHD review and approval, as shown below: <br />MORRIS <br />SHAFFER <br />E N G I N E E R I N G <br />Aijgust 10, 2024 Rev August 31, 2021 <br />Tony Grizelj <br />Metal Finishing Solutions, Inc. <br />1325 EI Pinal Drive <br />Stockton, CA 95205 <br />Tank System Integrity Report <br />Morris Shaffer Engineering Project # 20238 [Previous 182111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.