Laserfiche WebLink
MFS Response to Hazardous Material Violations: <br />PR0543520-1325 EI Pinal-Compliance-8-3-21 OIR <br />Page 6 of 8 <br />MFS has copies of "Hazardous Waste Tank System — Daily Inspection Log(s)" available for review <br />for January — July 2021. These inspection forms should have been available to the Inspector <br />during the July 20, 2021 SJC-EHD Inspection. <br />203. CCR 67450.3(c)(9)(F) Failed to have a complete new hazardous waste tank system <br />assessment. <br />OBSERVATION: This hazardous waste treatment facility has hazardous waste tanks with incomplete <br />tank assessments. <br />The PE Certification statement is incomplete. Statement is missing "be" in "...to be the best <br />of... <br />- Capacity of secondary containment, seismic calculations, wall thickness determination <br />method, tank tightness test results, piping diameter and description of pumps are missing from <br />the tank assessments for the 1500 gallon acid waste tank, 1500 gallon alkaline waste tank, 1000 <br />gallon neutralization tank 1 and 1000 gallon neutralization tank 2. Note: This violation was noted <br />in the 8/31/2020 inspection report and has not been corrected. <br />CORRECTIVE ACTION: Have a qualified Professional Engineer update the tank assessment and <br />add the missing sections. Provide a CORRECTIVE ACTION statement and supporting <br />documentation to the San Joaquin County Environmental Health Department (EHD) within 30 <br />days. Provide a copy of the updated assessment, when available. <br />Metal Finishing Solutions (MFS) Response: <br />As mention above in item #2, MFS has received an updated a Waste Tank System Integrity <br />Report by Morris Shaffer Engineering in August 24, 2021. <br />Note that Morris Shaffer Engineering have since update their Waste Tank System Integrity Report and <br />MFS will submit this update for SJC-EHD review and approval, as shown below: <br />MORRIS <br />SHAFFER <br />E N G I N E E R I N G <br />Aijgust 10, 2024 Rev August 31, 2021 <br />Tony Grizelj <br />Metal Finishing Solutions, Inc. <br />1325 EI Pinal Drive <br />Stockton, CA 95205 <br />Tank System Integrity Report <br />Morris Shaffer Engineering Project # 20238 [Previous 182111 <br />