My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:40:34 AM
Creation date
1/12/2021 8:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN <br />CCUNT <br />Environmental Health Department <br />Permit By Rule Treatment Facility Inspection Report <br />Facility Name: <br />Facility Address: <br />1 <br />Date: <br />METAL FINISHING SOLUTIONS - STOCKTON <br />1325 EL PINAL DR, STOCKTON <br />July 20, 2021 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />in addition to that required in subsection 0)(1) of this section, to contain run-on and infiltration from a 25 -year, <br />24-hour rainfall event; <br />(3) tank system secondary containment shall be provided with a leak detection system that is designed and <br />operated so that it will detect either the failure of the primary and secondary containment structure or any release of <br />hazardous waste or accumulated liquid in the secondary containment system within 24 hours, or at the earliest <br />practicable time if the existing detection technology or site conditions will not allow detection of a release within 24 <br />hours. <br />Title 22 California Code of Regulations section 66265.193(f) <br />(f) Ancillary equipment shall be provided with full secondary containment (e.g., trench, jacketing, double -walled <br />piping) that meets the requirements of subsections (b) and (c) of this section except for: <br />(1) aboveground piping (exclusive of flanges, joints, valves, and connections) that are visually inspected for leaks on <br />a daily basis; <br />(2) welded flanges, welded joints, and welded connections that are visually inspected for leaks on a daily basis; <br />(3) sealless or magnetic coupling pumps and sealless valves, that are visually inspected for leaks on a daily basis; <br />and <br />(4) pressurized aboveground piping systems with automatic shut-off devices (e.g., excess flow check valves, flow <br />metering shutdown devices, loss of pressure actuated shut-off devices) that are visually inspected for leaks on a <br />daily basis. <br />CORRECTIVE ACTION: Have a qualified Professional Engineer update the tank assessment and add the missing <br />sections. Provide a corrective action statement and supporting documentation to the San Joaquin County <br />Environmental Health Department (EHD) within 30 days. Provide a copy of the updated assessment, when <br />available. <br />This is a repeat violation, Class II. <br />FA0024706 PR0543720 SCO01 07/20/2021 <br />EHD 22-04 Rev. 9/16/2020 Page 9 of 11 Permit By Rule Treatment Facility OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.