My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2022 11:40:34 AM
Creation date
1/12/2021 8:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Department <br />c Il ►I�JaAl II N <br />+r <br />C:pUNTY <br />r o- Greotness grows here, <br />RETURN TO COMPLIANCE CERTIFICATION <br />Any MINOR violations noted in the "Notice to Comply" in the attached Inspection Report must be corrected within 30 days of <br />receipt of this inspection. This certification form must be submitted to the Environmental Health Department (EHD) address at <br />the bottom of this form within 30 days of receipt of the Inspection Report. HSC 25404.1.2(c)(1) <br />All corrections to other violations noted in the attached Inspection Report (IR) or Continuation Form, or disputes to any <br />violations, are to be submitted using this certification and returned to EHD within 30 days unless otherwise specified in the <br />Inspection Report. HSC 25185(c)(3) <br />Note: All EHD staff time associated with failing to comply by the above noted dates will be billed <br />at the current hourly rate. <br />For this certification to be complete, the operator of the site must include: <br />A statement documenting what corrective actions were taken or will be taken for each violation <br />Copies of sample results/manifests/training records/other appropriate paperwork, and/or photos verifying corrections <br />Operator's certification <br />Inspection Date: July 20, 2021 <br />Facility Address: 1325 EL PINAL DR STE 1, STOCKTON <br />I certify under penalty of law that: <br />Inspected By: ELIANNA FLORIDO <br />CERS ID: 10743571 <br />1. I have corrected the violations specified in the Inspection Report from the above-mentioned inspection date. <br />2. 1 have personally examined the following documentation submitted as proof of compliance FOR EACH VIOLATION <br />and I believe the information to be true, accurate, and complete: <br />x x x <br />Photos Paperwork Statement <br />3. 1 am authorized to submit this certification on behalf of the Respondent. <br />4. 1 am aware that there are significant penalties for submitting false information, including the possibility of a fine <br />and/or imprisonment for known violations. (HSC 25191) <br />Name: Scott Renfrew <br />Title: IES (consultant) Senior Project Mgr. <br />Digitally s.g d by Scott R-f— <br />nhew(�iesenSglneerl <br />Signature: Date: <br />D202taa.3,zztstzo,00 <br />August 31, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.