Laserfiche WebLink
Spill Prevention compliance corporation <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> Email: spccorp a.hotmail.com <br /> Website: www.sj2cl2lan.com <br /> Certified Assessment Form (PE) for AST Systems <br /> Assessor: Spill Prevention Compliance Corporation Onsite Assessor:Todd McWhorter <br /> P.O. Box 1289 Telephone: (209) 969-0851 <br /> Waterford,CA 95386 email: specornAhotmail.com <br /> Client: Maxim Crane Contact : Mike Anderson/Mario Bermudez Service Manger <br /> Address: 2373 Mariposa Road Phone No.: (209) 464-7635 <br /> City/State/Zip; Stockton,CA 95205 Date of Test:_7/19/2016..9/10/2020 <br /> Assessment Data- Waste Oil AST-a <br /> 1. AST Configuration & age of ASTHorizontal AST Doublewall steel/approx 15+-yrs old(02/2018) <br /> Ia. Useful Life Remaining of AST AST has approximately 15 years of remaining life (,subsection 0410) <br /> 2. AST Primary vessel construction(describe) 1000 gals/Waste Oil/UL#11579/UL142-Container/Made to UL <br /> 142 construction standard-at least.093in.--2.3622mm steel thickness per UL Std for Safety for Steel <br /> Aboveground Tanks for Flammable and Combustible Liquids,suitable for containing waste oil. <br /> 3. AST piping(describe) 1 in. hydraulic hose with guick connect supipll to in. elevated Dipe to 1 in. <br /> hydraulic hose to (brand) pneumatic pump to in. hydraulic hose to 2 in opening w/fitting,from pump for <br /> supply to top of AST. There is an inline check valve between_supply line & pump. The connection snpply <br /> hose is kept upright when not in use to avoid any spilling from product in the supply Line. Piping is adequateLy <br /> secured, supported & protected against_physical damage and excessive stress due to settlement,vibration, <br /> expansion orcontraction, & was tested, found to be in good condition & not leaking. <br /> 4. Internal/External pump description external tank- mounted brand illegible pneumatic vump w/2 solenoid <br /> 12volt-10-200psi-w/continuous electronic monitoring & pneumaticauto shut down-External pump,which <br /> pumps from connecting to waste oil caddies from service area Ancillary equipment is secured to walls& <br /> supported and protected ag_anst_p_bysical damage and excessive stress due to settlement,vibration,expansion_ <br /> orcontraction (see Pic) <br /> 5. AST drawing(provided/drawn: source) (see attached) <br /> 6. Design Standard(ASME, UL, etc.) UL 142-Double Wall Steel/Mfr: Modesto Welding <br /> 7. AST foundation(describe),concrete sub-floor, Base of AST under UL 142 adeuuate to withstand the load <br /> of a full tank-Tank is/is NOW anchored to floor. <br /> 8. AST anchoring(seismic zone/floatation risk)AST is/is NOW anchored,with steel flansLesthru feet of tank <br /> which are welded to outer shell of tank,&%: in. anchor bolts into the concrete floor. (city,state) Stockton,CA <br /> is a(groundshaking) medium to high fault seismic region,likely to experience some moderate to severe <br /> earthquake activity, but with a lower level of frequency and intensity than areas which are adjacent to major <br /> active faults,which lie directly West of this area. Per CA Dept. ofConaervaliun-CA Geological Survey,this area <br /> is a moderate to high ground shaking intensity zone with a low hazard of flooding, and is in a non-saturated zone <br /> which nre(rJis a 10w tO moderate ligerefactian hyAard. These anclturs are intended to secure the tank du_!in u_ <br /> seismic event. There are two scenarios which would create loads upon them. The first scenario is an emptytank. <br /> With an empty tank, the ex ap nsion anchors resist the overturning moment through their tensile (pull-out) <br /> ca acit . Since the anchors are installed at the perimeter o the tank the distance between anchors in either <br /> directim0provides a sufficient lever arm for the concrete anchors to not exceed their allowable pull-reel capacity. <br /> The second load case is with a partially full or full tank_. lir this scenario, because the liquiel fills the bollam ofthe <br /> tank and increases its weight, the governinx load care becomes the shear capacity of'llse,concrete expansion <br /> anchors In the shear loading, all anchors resist the loads and their allowable capacity is not exceeded. This load <br />