Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Farm <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum R3 Hydrostatic <br /> Test Equipment Used: lake test <br /> Sump1UDC ID reg stp plus stp sup stp 1/2 uac <br /> Sump Manufacturer unknown unknown unknown environ <br /> Sump Depth (inches) 70 70 70 30 <br /> Sump Bottom to Top of 19 22 20 9 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:46 9:33 9:33 12:22 <br /> Initial Reading 23in 26in 24in 13in <br /> Test End Time 11:46 10:33 10:33 13:22 <br /> Final Reading 23in 26in 24in 13in <br /> Change in Reading 0 0 0 0 <br /> PasslFail Criteria .125in .125in .125in .125in <br /> Tightness Test Results 0 pass ❑ Fail 0 Pass ❑ Fail 14 Pass ❑ Fail J Pass ❑ Fail <br /> Sump/UDC ID 3/4 uac 5/6 uac 7/8 uac 9/10 uac <br /> Sump Manufacturer environ environ environ environ <br /> Sump Depth (inches) 30 30 30 30 <br /> Sump Bottom to Top of 9 9 9 9 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:22 12:22 12:22 10:46 <br /> Initial Reading 13in 13in 13in 13in <br /> Test End Time 1322 1322 13:22 11:46 <br /> Final Reading 13in 13in 13in 13in <br /> Change in Reading 0 0 0 0 <br /> PassfFall Criteria .125in .125in .125in .125in <br /> Tightness Test Results R] Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fall"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />