Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST(continued) <br /> Test Method Developed by Ll Manufacturer 0 Industry Standard Ll Professional Engineer <br /> Test Type El Pressure 11 Vacuum ® Hydrostatic <br /> Test Equipment Used: lake test <br /> Sump1UDC tD 11/12 udc <br /> Sump Manufacturer environ <br /> Sump Depth (inches) 29 <br /> Sump Bottom to Top of 9 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:46 <br /> Initial Reading 13in <br /> Test End Time 11:46 <br /> Final Reading 13in <br /> Change in Reading sup <br /> PasslFail Criteria .125in <br /> Tightness Test Results 0 Pass LJ Fail Ll Pass Ll Fail Ll Pass LJ Fail LJ Pass J Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results El Pass El Fail E) Pass El Fail E) Pass D Fail El Pass L] Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fall"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />