Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Farm <br /> 9. COMMENTS <br /> 87 secondary lines a and b failedsite of failure unknown.91 secon ary line a failed at dumper Penetration in u c 2 an 3/4. 89 secondary line b failed at jurr per <br /> hose penetration in ude 3/4 and 11/12.all others passed.hydrostatic annulars. <br /> Ali tests marked"Far!"and any repairs made before or during the tightness fest must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />