My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 1:35:54 PM
Creation date
1/15/2021 11:23:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMED Model Al 1 o0 Overfill <br /> WHEATON RETAIL Prevention Valve OPV <br /> Flapper Valve. Primary Float <br /> 77 <br /> YL <br /> is <br /> Step 4: Slowly insert the Model A0081- Figure 3: Hook end secured to the Figure 4: Close-up <br /> 1101 test tool from the bottom of the underside of the flapper valve- <br /> lower tube until the hook end secures to <br /> the underside of the flapper valve. <br /> Refer to Figures 3 and 4 for details. <br /> Testing the Primary Float and Flapper Valve: <br /> NEW <br /> - f Figure 5: Primary float, down- <br /> - 4� ward position. <br /> Step 5: With the flapper valve latched Step 6: Using a scribe move the pri- NIL open, and the hook end secured, gently mary float upward to unlatch the flapper <br /> tug on the test tool, the flapper valve valve, and with the hook end secured, <br /> must remain open. gently tug on the test tool, the flapper <br /> valve must close, the test tool will move <br /> about 3" downward. Refer to Figures Figure 6: Primary float, upward <br /> 5, 6. 7 and 8 for details, position. <br /> Figure 7: Primary float upward, flapper Figure 8: Primary float upward, flapper Step 7: Using the scribe move the pri- <br /> valve unlatched and closing. valve unlatched and closed. maty float downward- <br /> IMPORTANT: Perform steps 6 Step 10: Re-install the fill adapter, cap <br /> through 8 a minimum of three times and spill container lid on the tank fill <br /> to assure the primary float, latch and riser. <br /> flapper valve components of the <br /> Model A1100 OPV are operating prop- <br /> erly. <br /> Step 9: Lift the Model A1100 OPV with <br /> the collar upward and re-install on the 2300 industrial Park Dr.•Wilson, NC 27893 <br /> Step 8: With the hook end secured, tank fill riser. Replace the drop tube 252-243.0150•252-243-4759(fax) <br /> gently allow the flapper valve to move o-ring part number 569461 if damaged www-emcoretaii.com <br /> upward and spring back into an open or missing. <br /> position, tug gently on the test tool, the 2018 Emco Wheaten Retail Corporation <br /> flapper valve must relatch and remain TP-A1100 <br /> 2 08118, Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.