Laserfiche WebLink
EBW Phase I Equipment <br /> Required Inspection & Maintenance <br /> Spill Containment Manholes Drop Tube Mounted Overfill Prevention <br /> • Perform inspection and maintenance duties at least Valves <br /> once a year. • Perform inspection and maintenance duties at least <br /> • Remove any standing liquid and dispose of it properly. once a year. <br /> • Brush all buildup off of the brass drain valve screen of • Inspect the inside of drop tubes for broken dip sticks or <br /> applicable). noticeable damage to the valve flapper. If any damage is <br /> • Remove all dirt and foreign materials. observed, then the valve must be replaced. <br /> • Scrape all foreign materials away from the tank lid • If it has not already performed during drain valve testing, <br /> sealing surfaces. leak test the Drop Tube assembly using the established <br /> • Should it be necessary to replace a drain valve due to "Pressure integrity Test"for Drop Tube/Overfill <br /> breakage or considerable contamination buildup, use Prevention Device (TP201.1C or TP201.1❑). <br /> EBW 705.337-19 Replacement Drain Valves only. EBW doesn't require that the drop tube be pulled for <br /> • Perform a leak test using the established "Pressure inspection unless damage is noted. Should local authority <br /> Integrity Test"for a combination of Drop Tube, Drain require removal of the drop tube, the following seals and <br /> Valve, and Overfill Prevention Device (TP201.1 D). inspection steps are necessary: <br /> • Use 90079 Drop Tube Isolation Test Kit. Replace Drop Tube Isolation Gland (if applicable) seal <br /> Rotatable Fill & Vapor Adapters, Dust Caps & kit-90090 <br /> Probe Riser Adapters Replace Drop Tube Flange Gasket--11182-01 <br /> • Perform inspection and maintenance duties at least Inspect the Tank Bottom Protector for freedom of <br /> once a year. movement. Repair or replace if necessary. <br /> • Inspect all product and vapor riser dust cap seals for Inspect OPD components, use instructions on EBW <br /> damage. If damage is observed, replace the seal with from 6329. <br /> either the Aluminum Vapor Cap Seal or the Nylon • inspect drop tube jaint sealant. Repair with EBW part# <br /> Product Cap Seal. 11372-01 only. <br /> • Perform Rotatable Adapter maintenance as specified by Ball Floats & Extractor Valve Bodies <br /> Phil-rite Enterprises, Inc. Perform established 'Static . No annual maintenance is required. <br /> Torque Test", TP201.1 B. <br /> • Leak testing should be accomplished during the Pressure Vacuum Vent Valves <br /> "Pressure Integrity Test"for a drain valve or Drop Perform the required maintenance as specified by <br /> Tube Mounted Overfill Valve,TP201.1 C or TP201.1❑- <br /> Dusky Corporation. <br /> Annual maintenance of the probe riser cap assemblies At least once every three years, unless otherwise specified <br /> is normally not required. Whenever probe service is by a local authority, perform the established"Static <br /> necessary, inspect the service cap seal for damage and Pressure Performance Test" JP201.37. <br /> replace it, if necessary, at that time with a Probe Riser <br /> Cap Seal. <br /> Please contact Technical Support if assistance is needed. <br /> 4a <br /> Franklin Fueling Systems <br /> 3760 Marsh Road <br /> Madison,WI 53718,U.S.A. <br /> Tel:+1 608 838 8786 <br /> Tel:USA&Canada 1 Boo 225 9787 <br /> Tei;Mexico 001 800 738 7610 <br /> C 2015 F-6308 rev 3 www.franklinfuelMg.com <br />