My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2018 REV SITE INV WK PLAN+
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2018 REV SITE INV WK PLAN+
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 11:43:13 AM
Creation date
1/21/2021 3:51:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2018 REV SITE INV WK PLAN+
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
920
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• � Page 4 <br /> Brusca File No. 137-002 February 12,2018 <br /> Murphy Parkway Property Soil Gas Monitoring Wells <br /> the SJCEHD has indicated that VP-1 should be abandoned in conjunction with the new <br /> monitoring well installation work. <br /> The soil gas monitoring well VP-1 was abandoned on January 16, 2018 via over-drilling with a <br /> track-mounted drill rig. The abandonment work was performed by a licensed C-57 drilling <br /> contractor with oversight by the SJCEHD. Following complete over-drilling of the soil gas <br /> monitoring well, the resulting borehole was sealed with neat cement grout via tremmie in accord <br /> with SJCEHD requirements. <br /> SOIL GAS MONITORING <br /> The required soil gas monitoring program consists of monthly monitoring for a period of one <br /> year, and quarterly monitoring for a period of four years thereafter. The first <br /> monitoring/sampling of the new soil gas monitoring wells was conducted on January 26, 2018, <br /> following a 10-day equilibration period following well installation. The January 2018 <br /> monitoring results will be presented under separate cover in the near future. The February 2018 <br /> sampling/monitoring event is planned for later this month. <br /> CLOSING <br /> This report will be submitted to the SJCEHD, CalRecycle, and the CVRWQCB. Additionally, <br /> Well Completion Reports will be submitted to the California Department of Water Resources as <br /> required. If you have any questions or require additional information, please contact the <br /> undersigned at(916) 677-1470. <br /> Sincerely, <br /> BRUSCA ASSOCIATES, INC. <br /> BRUSCA <br /> t4o. 1948 <br /> aiTm{E4 <br /> ENG iNEERiNG <br /> Jo Brusca GEOLOGW �Q <br /> ncipal Engineering Geologist OF CAL�Fd¢? <br /> Certified Engineering Geologist No. 1948 <br /> Attachments: Plate 1, Vicinity Map <br /> Plate 2,Site Map <br /> Plate 3,Detail Map <br /> Plate 4,Log of Soil Gas Monitoring Well, SGMWI <br /> Plate 5,Log of Soil Gas Monitoring Well, SGMW2 <br /> SJCEHD Well Permit Documentation <br /> JB.jb <br />
The URL can be used to link to this page
Your browser does not support the video tag.