My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:02:27 PM
Creation date
1/22/2021 2:13:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 3 : CUT THE UPPER DROP TUBE <br /> Attach the supplied band clamp to the upper tube <br /> just below the mark and ensure that it is assembled <br /> square to the tube . The clamp can be used as a <br /> guide for making a square cut. If a vise is used , <br /> clamp on the valve body casting only to avoid Band Clamp <br /> damage to the float and tubes (See Figure 3A) . <br /> Carefully saw through the tube squarely , at the mark <br /> made in Step 2 . Use a hacksaw with a new fine. <br /> tooth blade . Rotating the upper tube as the sawing <br /> progresses will minimize run out and ensure a <br /> square 90-degree cut . Remove the band clamp <br /> after tube is cut . <br /> CAUTION -DO NOT use a pipe or tubing cutter to <br /> cut the upper drop tube , this may damage the tube , Cut Line <br /> causing it to be out of round thereby prohibiting Figure 3B <br /> assembly of the unit. <br /> STEP 4 : FILE THE UPPER DROP TUBE <br /> IMPORTANT : Remove all chips and shavings File the upper tube square , and remove any burrs or <br /> generated in steps 3 thru 5 out of the cut end of the rough edges . Make sure the cut is flat and square . <br /> tube . DO NOT remove chips and shavings by <br /> dumping thru valve body . IMPORTANT : Carefully file a good chamfer on the <br /> inside edge of the drop tube to provide a lead -in for <br /> the polypak seal and inlet tube installed in step 8 . <br /> Fine half round file <br /> Figure 3A <br /> Figure 4 <br /> 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.