My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:02:27 PM
Creation date
1/22/2021 2:13:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
black moly grease to the polypak as shown . Make <br /> STEP 5 : SAND THE UPPER DROP TUBE sure coverage is completely around the polypak <br /> Sand the inside of the drop tube with sandpaper seal . <br /> and/or steel wool to remove all burrs and sharp <br /> edges . After sanding wipe down the inside of the Ensure polypak <br /> tube with a clean rag from the top to approximately 4 lip is up <br /> inches down to remove any debris . — <br /> Caution : Failure to properly chamfer, sand , and % \ <br /> clean the drop tube may cut the seal and result Inlet <br /> in a failure of a pressure decay leak test. <br /> Tube ) \ Polypak <br /> Apply grease <br /> around polypak <br /> Figure 7 <br /> STEP 8 : INSTALL INLET TUBE <br /> Insert the inlet tube into the upper tube until the <br /> Ze \ upper tube seats against the flange on the inlet tube . <br /> Fine grit sandpaper Ensure polypak is inserted evenly and stays in inlet <br /> tube groove . <br /> Figure 5 <br /> STEP 6 : APPLY GREASE TO DROP TUBE <br /> Apply black moly grease to the inside diameter of <br /> the upper drop tube . Make sure coverage is <br /> completely around the tube as shown in Figure 6 . <br /> Q <br /> Figure 8 <br /> SEE PAGE 8 FOR INSTRUCTIONS USING THE <br /> 71 SO-TOOL . <br /> SEE PAGE 9 FOR INSTRUCTIONS USING THE <br /> Figure 6 71SOwTOOLC , <br /> STEP 7 : APPLY GREASE TO POLYPAK SEAL <br /> Ensure that the polypak seal is installed on the inlet <br /> tube with the lip up as shown in Figure 7 . Apply <br /> 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.