My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:02:27 PM
Creation date
1/22/2021 2:13:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71S0-TOOLC PROCEDURE BELOW, Caution : If the drill stop is not in the proper <br /> FOR 71S0 -TOOL , SEE PAGE 8 location failure of a pressure decay leak test may <br /> result. <br /> STEP 913 : INSERT 71S0-TOOLC OVER INLET 71 SOJOOLIC <br /> TUBE <br /> To install the 71 SO-TOOLC (sold separately) over <br /> the inlet tube , first loosen the thumb screw , so the o <br /> tool can pass freely over the inlet tube flange . Align <br /> the slot on the tool with the key on the inlet tube and <br /> insert the tool down . See Figure 9B . <br /> Tool Slot Hand tighten thumb Tip to stop dimension <br /> o screw must be 1 -3/ 16 " to 1 - 1 /4" <br /> o d <br /> Figure 11B <br /> Loosen <br /> thumb <br /> screw STEP 12B : DRILL HOLES <br /> With the inlet tube and 71 SO -TOOLC in place , <br /> Inlet carefully drill a 3/ 16" diameter hole in the upper tube <br /> Tube using the hole in the 71 SO-TOOLC as a guide . The <br /> Key drill stop is positioned so it will bottom out against <br /> the tool after the bit has drilled through the upper <br /> drop tube . If the stop is positioned wrong either no <br /> hole will be drilled , or a through hole could <br /> potentially be drilled through the inlet tube . If no <br /> hole is drilled return to step 11 and check the stop <br /> dimension . If a hole is drilled through the inlet tube <br /> or into the screw hole the assembly is not <br /> salvageable . Drill (2) more holes in the two <br /> Figure 9 Figure 10 remaining guide holes . <br /> STEP 1013 : TIGHTEN THE 71S0 -TOOLC o <br /> i Ensure that the tool seats flat against the top of the <br /> inlet tube . To prevent vertical movement of the tool <br /> during drilling , hand tighten the thumb screw against <br /> I the upper drop tube . See Figure 10B . <br /> STEP 11 B : PREPARE DRILL AND BIT <br /> Confirm that the stop on the 3/16" drill bit supplied Drill through upper tube only <br /> with the 71 SO-TOOLC is in the correct position <br /> before drilling . The stop is factory installed at a <br /> distance between 1 -3/16" to 1 - 1 /4" from the tip with <br /> the 71 SO -TOOLC . If the stop is not at the correct Figure 1213 <br /> position it must be fixed before drilling . <br /> 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.