My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:02:27 PM
Creation date
1/22/2021 2:13:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71SO=TOOL PROCEDURE BELOW, Caution : If the drill stop is not in the proper <br /> FOR 71SO =TOOLC , SEE PAGE 9 location failure of a pressure decay leak test may <br /> result. <br /> STEP 9A : INSERT 71SO TOOL OVER INLET <br /> TUBE 71 SO - TOOL <br /> To install the 71 SO -TOOL (sold separately) over the <br /> inlet tube , first loosen all three knobs , so the tool can C, <br /> pass freely over the inlet tube flange . Align the slot <br /> on the tool with the key on the inlet tube and insert <br /> the tool down . See Figure 9A . <br /> Loosen all Hand Tip to stop dimension <br /> Tool slot knobs View holes tighten must be 2 to 2- 1 /16 inch <br /> knobs Figure 11A <br /> evenly <br /> STEP 12A : DRILL HOLES <br /> ® With the inlet tube and 71SO TOOL in place , <br /> carefully drill a 3/16" diameter hole in the upper tube <br /> o using the drill bushing in the knob as a guide . The <br /> drill stop is positioned so it will bottom out against <br /> the knob after the bit has drilled through the upper <br /> drop tube. If the stop is positioned wrong either no <br /> Inlet hole will be drilled , or a through hole could <br /> Tube potentially be drilled through the inlet tube . If no <br /> key hole is drilled return to step 11 and check the stop <br /> dimension . If a hole is drilled through the inlet tube <br /> or into the screw hole the assembly is not <br /> salvageable . Drill (2) more holes in the two <br /> remaining knobs . <br /> Figure 9A Figure 10A <br /> STEP 10A : TIGHTEN THE 71SOmTOOL <br /> Use the three view holes to ensure that the tool <br /> seats out flat against the top of the inlet tube . To <br /> prevent vertical movement of the tool during drilling <br /> hand tighten all three knobs evenly the upper drop <br /> tube . See Figure 10A . <br /> Drill thru upper <br /> tube only <br /> STEP 11A : PREPARE DRILL AND BIT <br /> Confirm that the stop on the 3/16" drill bit supplied <br /> with the 71 SO -TOOL is in the correct position before Figure 12A <br /> drilling . The stop is factory installed at a distance <br /> between 2 " to 2A /16" from the tip with the 71SO " <br /> TOOL . If the stop is not at the correct position it <br /> must be fixed before drilling . <br /> 68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.