My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:02:27 PM
Creation date
1/22/2021 2:13:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer N Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure N Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 91 Diesel <br /> Tank Manufacturer j <br /> Tank Capacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer N Industry Standard ❑ Professional Engineer <br /> Test Type N Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run 1D 87 Product 91 Product Diesel Prod <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 9:00 9:00 9:00 <br /> Initial Reading 5 5 5 <br /> Test End Time 10:00 10:00 10:00 <br /> Final Reading 5 5 5 <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results LN Pass ❑ Fail N Pass ❑ Fail N Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> Al!tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.