Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> [—T—est Equipment Used: ELDS <br /> Sump1UDC ID 87 STP 91 STP Diesel STP 87 Fill <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:20 11:17 11:03 9:54 <br /> Initial Reading 0.5112 4.7030 1.5569 4.4543 <br /> Test End Time 12:35 11:32 11:18 10:09 <br /> Final Reading 0.5106 4.7027 1.5569 4.4541 <br /> Change in Reading 0.00061 0.00037 0.00003 0.00027 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID 91 Fill Diesel Fill Vent sump UDC 112 <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 7:57 7:57 3:39 2:47 <br /> Initial Reading 2.3667 4.7468 4.1096 0.3803 <br /> Test End Time 8:12 8:12 3:54 3:02 <br /> Final Reading 2.3677 4.7478 4.1096 0.3804 <br /> Change in Reading 0.00107 0.00105 0.00005 0.00017 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />