Laserfiche WebLink
Day of Week: Monday I Tuesday I Wednesday I Thursday Friday Satruday Sunday <br /> Date: 1 j-13-4-011- jij-202 /-/ -ZU 1-1to-ZAD I -lam l-f - I t-\y-lo <br /> Operator Initials: f^, <br /> EPA Method 22: Location 5th Level of Boiler Structure. <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N Time Y/N Time Y/N Time Y/N Time Y/N ITime Y/N Time Y/N ITime <br /> Conveyor"E" Conveyor"F" kY, 10715Og 6710 IJ --VZo ZO 0 8M 1 900 <br /> Overfeed Screw Conveyor"G" iv, I avr 115'.30 /U fJ -FTS rJ t0 <br /> Conveyor"G" Conveyor"F" W 107XjQIld ON3 +Sol M D3 OLO <br /> Conveyor"F" Boiler drag Chain o7,,a 0930 )0 N 135 N y0840 <br /> South Fuel Yard Ground 0 �/ j A) 0 g�j $c{0 <br /> Fly Ash Silos, Visible Dust? g AJ 1 C) 2 jJ 950 <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR x66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Date: /= -20 -N-ZO l-15-u/ -t(p LO -R- l-0-2z> HILA-M <br /> Inspectors initials: <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in <br /> good working order? (If applicable) <br /> 2)Are all above ground portions of the tank <br /> free of corrosion or realease of any waste? <br /> 3)Is there indication of release of any waste? y A) N JJ <br /> 4)Any flyash escaping from silos or loading area? <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= j, Date: -ZOZ© .1-16 <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />