Laserfiche WebLink
Day of Week: Monday Tuesday Wednesday Thursday Friday Satruday Sunday <br /> Date: / -6-40 ' <br /> .10 % Zo — 1.110- O 1-t,za <br /> Operator Initials: - K CAJC <br /> EPA Method 22: Location 5th Level of oiler Structure. <br /> Permit ID N-645-37-0: Biomass fuel handling operation with metering bin,Reclaim conveors,and other associated conveyors. <br /> Condition 5: Permittee shall not cause or allow visible emissions from conveyor transport points. <br /> 1.)Perform a daily check for visible dust emissions for each tranfer point before noon. <br /> 2.)Make sure sun location is at your back while observing. <br /> Instructions: 3.)Observe the transfer Point for atleast 1 minute,and look for visible dsust missions. <br /> 4.)Mark"N"for no emissions,"Y"for visible emissions,and"NA"if the process is not running. <br /> 5.)If visible emissions are observed,Start a stop watch.If visible emissions are not rectified within 1 hour <br /> A Method 9 observation must be conducted. <br /> Boiler Structure: Box 1.)Visible emissions(Y/N). Box 2.)Time of Day(Time). <br /> Boiler Structure: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Transerring From: Transferring to: Y/N ITime Y/N Time Y/N ITIme Y/N ITime Y/N ITIme Y/N Time Y/N Time <br /> Conveyor"E" Conveyor"F" /✓ 1000 /v /0 1-r CCO •00 <br /> Overfeed Screw Conveyor"G" Al <6�' /✓ /0's O "t05 ✓J <br /> Conveyor"G" Conveyor"F" n/ ,0vv ,ciS o o tis A) jo 4:11 f b <br /> Conveyor"F" Boiler drag Chain n/ /a=u N 10/s ICA :c 4' �(• <br /> South Fuel Yard Ground A/ ,0a' /1/ ,c•%s 1;7- tozo ryci /U 4' c) A) cc,tc) 0 <br /> Fly Ash Silos, Visible Dust? /1/ /Ow A/ /0/s = Ion T• 4: c(.2-51as— <br /> Hazardous Waste Above ground Storage Tank Inspection Maintain Daily Inspections For Three Years/Req: 22CCR s66265.195 <br /> Day of Week: Monday Tuesday Wednesday Thursday Friday Saturday Sunday <br /> Date: / 6 z i.7. zs �- - /` 0 1 •(0-20 I-tS_ZO <br /> Inspectors initials: 020 <br /> 1)Are all overfill/spill control equipment,waste <br /> cutoff systems,bypass and drainage systems in / ' U y <br /> good working order? (If applicable) l T t / <br /> 2)Are all above ground portions of the tank (� <br /> free of corrosion or realease of any waste? <br /> 3)is there indication of release of any waste? <br /> 4)Any flyash escaping from silos or loading area? 7t/ ,�.� ✓U <br /> 5)Record Ash,Trona Silo Baghouse DP Readings first week of each Month:Trona #1= #2= Date: <br /> Tank must be marked USED OIL-HAZERDOUS WASTE and have an accumulation start date. <br /> Comments: Note:In the time column put TIME OF DAY. <br /> Page 7 <br />