Laserfiche WebLink
0051140 tlnl81NE EXISTING TABS ANNU <br /> JUMP (TYP. 4F 4) 17 <br /> L I <br /> (TYP_ Or <br /> MTIHC n, <br /> (TTP Cf 3) <br /> EXISTING <br /> TANK J3 FfA] <br /> 20.000 -ii2' � <br /> (92 OCUNE) <br /> 1 -- i i 3Q W <br /> GALLON I �~ I I - - I Giant Une <br /> tv <br /> Rd <br /> itJ <br /> EXISTING I 4 <br /> TANK 02 <br /> (57 OCTANE)G&LOf yyy i <br /> N <br /> _ 1 <br /> EXISTING <br /> TAW # 1 <br /> I <br /> (87 OCTANE) 4 —� I <br /> 040 t I; ITNG <br /> J4 <br /> '1 14 <br /> CON <br /> Scope of Work <br /> _ . . _1 <br /> E}USiING COUHE WALL - I • 91A and 91B Product secondary piping failed SB989 testing.INWS <br /> O T— — —� • 91A/B secondary piping failed due to bad test boots in UDC's 1/2 <br /> I • • <br /> FASTNG r FLET B" I- - - - - - -. ��' and 11/12. We will remove and replace the test boots and retest <br /> TYWU WAIL PRCOKT - -- iNN 91A B secondary piping. If testing Passes, repairs will be <br /> �t� �S11RG C�h complete. If testing fails, we will troubleshoot and replace <br /> EMSTTNG 4' OVER 30 <br /> BGU81E WALL � t] � additional test boots as needed to achieve passing results. <br /> reviGU03 WPOR <br /> IEo0 UtY �• • UDC's 1/2, 3/4 and 11/12 failed SB989 secondary containment <br /> \ N t <br /> Ka Eso testing. <br /> CO <br /> FM$T1NG MTIIalIF1T '`� l '�, I FTNa • UDC's 1/2 and 11/12 failed due to bad test boots on the 91A/B <br /> EMG10� T 1 i ;- secondary piping. We will remove and replace the test boots as <br /> VUM"ALAHM WUNITDR needed and retest the UDC's. If testing passes, repairs will be <br /> SYSTEM, NONITUED 24 - - - - - - <br /> f•S-� HLYURS/DAY complete. If testing fails we will troubleshoot and replace entry <br /> i HELY CASfittings as needed to achieve passing results. <br /> 41' 4 UDC 3/4 failed possibly due to bad entry fittings but no visual <br /> • _ _____ J issues were found . We will tighten and adjust existing entry <br /> 9/10 - 5/6 - - 1/2 G • fittings and retest the UDC. If testing passes, repairs will be <br /> f I n complete. If testing fails we will troubleshoot and replace entry <br /> fittings as needed to achieve passing results. <br /> o - • We will remove/replace the existing conduit and piping entries as <br /> U I (^ 1 I needed in each UDC. <br /> } I • We will install (4) Icon Mfg #IRF1OB2.5 2" piping entry, ( 1) Icon <br /> 11 — - - - - - Mfg #IRF8B3 .5 3" piping entry ( 2) Icon Mfg #IRF4B1.4M conduit <br /> EIGSTIN� F 4 -- I I �p I I � I ---- 1 <br /> LJ 1 1 entry fitting as needed in each UDC. <br /> 3/q We will pretest all repaired components. <br /> 7/$ • Ourtechniciansare ICC and Manufacturer certified . <br /> -- <br /> � —� — • Local Regulatory Agency will be notified for any required <br /> inspections and forthe re-testing of repaired components . <br /> C s <br /> ff1 <br /> Costco Facility No . 0658 Site Location and Facility Layout <br /> 3250 W. Grant line Road j+ a Gomms}n •:+: o � ; l. : <br /> Tracy CA 95377 <br />