My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1990 - 1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_1990 - 1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 2:28:57 PM
Creation date
2/2/2021 2:07:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1990 - 1992
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All berms will be constructed to a height of 18 in. and a width of <br /> 3 feet except for the berm running adjacent to Area 1. This berm <br /> will be built to a height of 6 in. and a width of 2 feet so as not <br /> to interfere with landfill operations. Storm water will be directed <br /> overside to the toe of the landfill, where erosion control will <br /> consist of riprap extending 15 feet long, 10 feet wide, and 1 foot <br /> in depth. Drainage will terminate south of Area 3 where runoff will <br /> continue offsite into Corral Hollow Creek. <br /> Areas where ponding may occur such as depressions due to settlement <br /> will be filled with cover soil to insure adequate drainage from the <br /> working fill area. Also, if natural runoff impedes normal <br /> operations then that portion of land will be graded to provide for <br /> proper drainage. In the unlikely occurrence that ponding does <br /> occur, storm water will be pumped and drained to the ditch along <br /> the perimeter of the fill area using a portable pump. <br /> IV. BORBQW STOCKPILE <br /> It is estimated that approximately 32, 000 cubic yards of cover <br /> material will be needed during winter operations for the years 1990 <br /> - 1993 (See schedule on winter plan) . Daily cover needed for <br /> operations during these years will be imported prior to winter <br /> operation needs. Daily cover is to be stockpiled with respect to <br /> the sequence of landfill operations. For winter operations <br /> corresponding to the interval 1990 - 1991 Area 2 will be used to <br /> stockpile cover material while Area I is being filled. The sequence <br /> of operations is shown in Table 1. <br /> V. SUMMARY <br /> The Winterization Plan is designed to provide for 3 years of <br /> seasonal operations through the winters beginning November 1990 and <br /> ending in spring of 1993. In addition, adequate drainage, refuse <br /> space, and cover material are provided to insure limited <br /> maintenance and normal operation of the landfill. <br /> Sincerely Yours, <br /> 0410�14/"" <br /> Gabriel E. Karam, P.E. <br /> Solid Waste Engineer <br /> GB:RR:jl <br /> LA 21202A <br /> Attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.