Laserfiche WebLink
All berms will be constructed to a height of 18 in. and a width of <br />3 feet except for the berm running adjacent to Area 1. This berm <br />will be built to a height of 6 in. and a width of 2 feet so as not <br />to interfere with landfill operations. Storm water will be directed <br />overside to the toe of the landfill, where erosion control will <br />consist of riprap extending 15 feet long, 10 feet wide, and 1 foot <br />in depth. Drainage will terminate south of Area 3 where runoff will <br />continue offsite into Corral Hollow Creek. <br />Areas where ponding may occur such as depressions due to settlement <br />will be filled with cover soil to insure adequate drainage from the <br />working fill area. Also, if natural runoff impedes normal <br />operations then that portion of land will be graded to provide for <br />proper drainage. In the unlikely occurrence that ponding does <br />occur, storm water will be pumped and drained to the ditch along <br />the perimeter of the fill area using a portable pump. <br />IV. BORROW STOCKPILE <br />It is estimated that approximately 32,000 cubic yards of cover <br />material will be needed during winter operations for the years 1990 <br />- 1993 (See schedule on winter plan) . Daily cover needed for <br />operations during these years will be imported prior to winter <br />operation needs. Daily cover is to be stockpiled with respect to <br />the sequence of landfill operations. For winter operations <br />corresponding to the interval 1990 - 1991 Area 2 will be used to <br />stockpile cover material while Area 1 is being filled. The sequence <br />of operations is shown in Table 1. <br />•. SUMMARY <br />The Winterization Plan is designed to provide for 3 years of <br />seasonal operations through the winters beginning November 1990 and <br />ending in spring of 1993. In addition, adequate drainage, refuse <br />space, and cover material are provided to insure limited <br />maintenance and normal operation of the landfill. <br />Sincerely Yours, <br />Gabriel E. Karam, P.E. <br />Solid Waste Engineer <br />GK: RR: j 1 <br />LA 21202A <br />Attachment <br />