Amok <br />a, N 0 W <br />Ed Padilla <br />August 27, 1991 <br />Page 2 <br />The area to receive fill excluding the winter pad will cover <br />approximately four acres. During the two year period (1991-93), <br />approximately 78,000 cubic yards of space will be utilized by <br />compacting refuse in Areas 1, 2, and 3. The order of operation will <br />follow the schedule outlined on the plan. With the completion of <br />each area, final grades and slopes will be completed in accordance <br />with final grading plans for the Landfill. <br />The following is a table of locations and scheduling for waste <br />placement as indicated on the plan for the winter periods: <br />TABLE 1 : Landfill Operational Procedures <br />Year Location Capacity (C.Y.)* <br />(Approximate corners (Compacted Waste) <br />of fill areas) <br />AREA 1: <br />N93+00/E99+00 40,220 <br />91-92 N90+00/E102+00 <br />N92+00/E103+75 <br />N93+00/E103+75 <br />AREA 2• <br />N90+35/E100+65 21,013 <br />92-93 N93+00/E99+00 <br />N93+00/E103+65 <br />N91+60/E103+40 <br />N90+35/E102+00 <br />AREA 3: <br />N94+20/E98+00 16,415 <br />92-93 N94+20/E101+90 <br />N93+00/E103+00 <br />N93+00/E99+00 <br />*Based upon summary of cubic yardage/tons for the Corral Hollow <br />Landfill for fiscal year 1990-91 of 314,414 c.y. Includes daily <br />cover and assumes a compaction factor of 0.37. <br />II. WINTERIZATION PAD AND ACCESS ROAD <br />In preparation of winter disposal activities, a winterization pad <br />and roadway will be constructed to provide easy access and minimize <br />unloading operations. The winter pad and access road will be <br />constructed by compacting a two foot layer of foundation soil and <br />placing six inches of gravel with an oil and chip seal surface. If <br />