Laserfiche WebLink
Contingencies <br />The composting facility operates under a comprehensive fire protection plan reviewed by the <br />Lathrop -Manteca fire department. This plan include site management issues, and protocol to <br />follow in the event of a fire on the site. <br />The facility has back up plans in the event of a power outage or equipment breakdown that <br />would not allow full operation of the facility. The equipment is run on diesel so power outages <br />will not affect the operation of the primary equipment. This protocol includes renting <br />equipment (from Hertz Rental nearby or the equipment manufacturers) and bringing water on <br />site (from Gigli Hay, about 1.5 miles from the site). if the outage prevents the pumping of <br />water for more than 24 hours. Incoming material will be completely covered with a tarp if it is <br />not able to be incorporated in a timely manner, within three days of receipt. <br />OIMP Review <br />This OIMP will be maintained on-site and revised as necessary to reflect any changes in the <br />design or operation of this site. <br />The OIMP will be revised to reflect any changes and will be provided to the LEA within 30 days <br />of the changes. The OIMP will be reviewed once yearly on the anniversary of the approval and <br />any necessary changes or updates will be made at that time. <br />no <br />