My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2012-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
916
>
4400 - Solid Waste Program
>
PR0526865
>
CORRESPONDENCE_2012-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 12:17:34 PM
Creation date
2/2/2021 2:56:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2012-2013
RECORD_ID
PR0526865
PE
4443
FACILITY_ID
FA0018195
FACILITY_NAME
CENTRAL VALLEY COMPOST
STREET_NUMBER
916
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19126022
CURRENT_STATUS
01
SITE_LOCATION
916 W FREWERT RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Source of Odor <br />Possible Cause <br />Management <br />Feedstock receiving <br />Material arrives with odor <br />Immediately cover with green <br />material or other high carbon <br />material. <br />Incorporate into the <br />composting process as soon <br />as possible. <br />Monitor to insure the process <br />prevents odor from moving <br />off site <br />Material becomes odorous <br />Process and incorporate as <br />before it is incorporated <br />soon as possible <br />Mist processing (grinding) <br />area to prevent dust and odor <br />Reduce grinding activity if <br />wind is in direction of <br />receptors <br />Aisles/access roads <br />Unprocessed material in aisles <br />Maintain surfaces of site, <br />slope so that water is <br />collected in the pond. Treat <br />with clean carbon source if <br />necessary <br />Ponding water on site <br />Improve grading and <br />drainage, absorb with <br />material high in carbon <br />Windrows <br />Odor coming from windrow in <br />Check C:N ratio and ensure it <br />first few days <br />is maintained at 30:1 Add <br />bulking agent if necessary <br />Increase turning frequency, <br />check temperatures and <br />moisture <br />Curing/product storage <br />Decrease pile size <br />Re -incorporate and Increase <br />time in windrow <br />
The URL can be used to link to this page
Your browser does not support the video tag.