My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082610
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
13650
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 4:12:58 PM
Creation date
2/2/2021 2:56:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082610
PE
4219
STREET_NUMBER
13650
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05514023
ENTERED_DATE
9/16/2020 12:00:00 AM
SITE_LOCATION
13650 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATIONS 3T' <br /> Outlet"A" <br /> NOTES (Optional) <br /> 1. 4"plain end inlet/outlet — -- — -- <br /> 2. Unit weight-w/composite cover:92 lbs.;w/cast iron / 01utlet"B" <br /> c;over:147lbs. INLET A A/ (Standard) <br /> 3. Maximum operating temperature:190°F continuous <br /> 4. Capacities-Liquid:52 gal.;Grease:249 lbs.(35 gal.); I 4 <br /> Solids:12.5 gal. 28" J <br /> 5. Built-in Flow control. -- ----- — <br /> 6. For gravity drainage applications only, <br /> 7. Do not use for pressure applications. <br /> 8. Cover placement allows full access to tank for <br /> proper maintenance. Pedestrian traffic load rated, <br /> 9. Vent not required unless per local code. outlet"C" <br /> 10.Engineered inlet and outlet diffusers are removable bolted,gas/watertipht (optional)—/ <br /> to inspect/clean piping. <br /> composite covers.(2.000 lbs.). <br /> 11. Integral air relief/Anti-siphon • <br /> DIFFUSION FLOWTECHNOLOGY <br /> The inlet diffuser splits influent into three paths,creating q of inlet <br /> laminar flow and utilizing the entire liquid volume of the tank and outlet 24-1/2" <br /> for efficient grease separation.The calibrated openings See note#11 <br /> greatly reduce effluent turbulence.The effluent enters the <br /> main chamber without disturbing the existing grease or <br /> sediment layers. <br /> The integral air relief/anti-siphon in the top of the outlet 10-1/2" <br /> diffuser allows pressure stabilization within the unit during <br /> operation.The bottom of the outlet diffuser allows only 28-1/2" <br /> effluent which is free of grease to exit the tank.It can easily — — --be attached to any of the three outlets provided to ease <br /> jobsite piping layouts. 18" <br /> Static � 15-314" <br /> ENGINEER SPECIFICATION GUIDE <br /> water line Invert <br /> Schier Great Basin T11 grease interceptor model u GB-50 <br /> shall be lifetime guaranteed and made in USA of seamless, <br /> rotationally-molded polyethylene.Interceptor shall be En sneered Inlet and <br /> furnished for above or below grade installation.Interceptor out at diffuser <br /> shall be certified to ASME A112.14.3(type C)and CSA 6481.1, (see description) <br /> with field adjustable riser system,built-in flow control,built-in <br /> test caps and three outlet options.Interceptor flow rate <br /> shall be 50 GPM.Interceptor grease capacity shall be 249 SECTION <br /> lbs.Cover shall provide water/gas-tight seal and have <br /> minimum 16,000 lbs.load capacity. <br /> CERTIFIED PERFORMANCE <br /> GreaL Basin hydromechanical grease interceptors are third <br /> party performance-tested and listed by IAPMO to ASME 28" <br /> ttA112.14.3 and CSA 8481.1 grease interceptor standards and <br /> greatly exceed requirements for grease separation and <br /> storage.They are compliant to the Uniform Plumbing Code _ <br /> and the International Plumbing Code. Adjustable adapters with <br /> DQ NO EXCEPTION TAKEN ED MAKE CORRECTIONS NOTED up to 3-1/2'of adlustability <br /> ❑REJECTED ❑REVISE AND RESUBMIT <br /> ❑SUBMIT SPECIFIED ITEM <br /> �Ne <br /> CHECKING IS ONLY FOR CONFORMANCE WITH THE DESIGN Tie down <br /> CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE oint for <br /> CC ® WITH THE INFORMATION GIVEN IN THE CONTRACT <br /> DOCUMENTS, ANY ACTION SHOWN IS SUBJECT TO THE tlnchorkit <br /> REQUIREMENTS OF THE PLANS AND SPECIFICATIONS. <br /> CONTRACTOR IS RESPONSIBLE FOR DIMENSIONS WHICH <br /> SHALL BE CONFIRMED AND CORRELATED AT THE 108 SITE. <br /> COORDINATION OF HIS WORK WITH THAT OF ALL OTHER <br /> TRADES AND THE SATISFACTORY PERFORMANCE OF HIS <br /> WORK. <br /> TURLEY AND ASSOCIATES,INC <br /> 2431 CAPITOL AVENUE <br /> SACRAMENTO,CA 95816 OUTLETENDVIEW <br /> DATE 09/04/2020 By Brian Provencal <br /> SCHIER MODEL NUMBER: DESCRIPTION:Polyethylene Grease Interceptor <br /> G B�JD 50 GPM 5YOM lcapacity <br /> Q r�tf' - PART tt:4025 001-XX DWG BY:G.O't3oyle DATE:10/08/2015 REV:0 _/_/201_ ECO: <br />
The URL can be used to link to this page
Your browser does not support the video tag.