Laserfiche WebLink
INSTAL LAT I O N (1 of 2) Native soil <br /> Backfill <br /> Well packed base <br /> WARNING!DO NOT AIR TEST UNIT OR TELEGLIDE Concrete slab <br /> RISER SYSTEM!Doing so may result in property damage, Finished grade <br /> personal injury or death. Adapter <br /> LEAK/SEAL TESTING Riser <br /> .;ap/plug aH base unit plumbing connections and remove covers.For <br /> base unit testing,fill with water to just above the highest connection.For <br /> riser system testing(if required)fill with water to finished grade level. - <br /> CAUTION:Risers must be supported before filling with water to <br /> prevent tipping.Inspect unit,connections and all gaskets and clamps(if <br /> applicable)for leaks.Check water level at specific time intervals per local <br /> :ode. <br /> Flow stq <br /> GENERAL INSTALLATION INSTRUCTIONS control <br /> plate <br /> Schier grease interceptors are manufactured with an internal flow control r?;' <br /> iystem.They do not require an external flow control system or air intake: <br /> lent.Schier grease interceptors are not to be installed in any other _ <br /> manner except as shown.Consult local codes for separate trapping <br /> requirements.cleanout locations and additional installation instructions. Optional anrhor ka <br /> I. Sett unit on level solid surface:as close as possible to fixtures being served. <br /> 2. Connect outlet diffuser to the desired outlet(A,B,C).Unit is shipped with <br /> the outlet diffuser in location B and sealing caps on locations A and C. <br /> 3. Connect inlet and nt tlet.drainage lines to unit.Mechanically couple <br /> pipes to unit.Do not solvent weld. FLOWCONTROL EXCAVATIONAND, <br /> 1. For units with east iron cover,remove retainer clips prior to burial. PLATE DETAIL BACKFILL DETAIL <br /> NOTE:Do not.install below a hydrostatic:slab. <br /> BELOW GRADE INSTALLATION INSTRUCTIONS Riser to Grade FinishedgradL <br /> EXCAVATION <br /> I. Surrounding soil must be undisturbed soil or well compacted <br /> engineering fill. <br /> 2. Width and length of excavation shall be a minimum of 12"greater than <br /> the tank on all sides and depth shall be 6"deeper than tank bottom. <br /> 3. Set the tank level on a 6"deep layer of well-packed crushed aggregate Q <br /> material and connect waste piping per General Installation Instructions. <br /> Recommended 2-Way <br /> BACKFILL cleanout tee to grade <br /> I- Preparation of sub grade per geotech recommendations. (by others) <br /> 2. Stabilize and compact sub grade to 95%proctor. <br /> 3. Fill unit with water before backfilling to stabilize unit and prevent float-out Optional <br /> during backfilling.Secure covers and risers(if necessary)to the unit. anrhor k <br /> 1. Backfill evenly around tank using crushed aggregate(approximately 3/4' <br /> size rock or sand,with no fines),or flowable fill.Do not compact backfill • A <br /> around unit. <br /> FINISHED CONCRETE SLAB <br /> slab must extend 18"minimum outside the unit footprint. i OP VIEW <br /> Pedestrian traffic or greenspace areas:4'Thick reinforced concrete mmin min <br /> i <br /> ;lab required. <br /> --I--T'A'4 - <br /> Vehiclular traffic areas:Minimum 8"Thick concrete slab with rebar Concrete Slab + <br /> ,js��\ r r i t8 min <br /> �equired.Thickness of concrete around cover to be determined by <br /> Reber <br /> specifying engineer.If traffic Loading is required the concrete slab Re <br /> Jimensions shown are for guideline purposes only.Concrete to be 28 day <br /> :ompressive strength to 4,000 PSI.Use NO.4 rebar(o 1/2")grade 60 <br /> steel per ASTM A615:connected with tie wire.Reber to be 2-1/2"from edge <br /> if concrete and spaced in a 12'grid with 4"spacing around access <br /> IR•min <br /> Dpenings. X NO EXCEPTION TAKEN (1 MAKE CORRECTIONS NOTED <br /> ❑REJECTEDO REVISE AND RESUBMIT <br /> n SUBMIT SPECIFIED REM <br /> CHECKING IS ONLY FOR CONFORMANCE WITH THE DESIGN ELEVATION VIEW <br /> CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE <br /> WITH THE INFOR/MTION GIVEN IN THE CONTMCT <br /> DOCUMENTS.ANY ACTION SHOWN IS SUBJECT TO THE 4• <br /> REQUIREMENTS OF THE PLANS AND SPECIFICATIONS. Finished grade <br /> CONTRACTOR IS RESPONSIBLE FOR DIMENSIONS WHICH <br /> SHALL BE CONFIRMED AND CORREULTED AT THE JOB SITE'. Rebar ------------------------ B' <br /> COORDINATION OF NO WORK WITH THAT Or ALL OTHER <br /> TRADES AND THF SATISFACTORY PERFORMANCE OF HIS <br /> WORK. <br /> TURLEY AND ASSOCIATES.INC <br /> 2431 CAPITOL AVENUE CONCRETE A • A Areas)Traffic <br /> SACRAMENTO,CA 95616 <br /> DATE 09/04/2020 B,Brian Provencal <br /> MODEL NUMBER: DESCRIPTION:Polyethylene Grease Interceptor <br /> GB-50 50 GPM-52 gallon capacity <br /> - PART tt: 025 001-XX DWG BY:G.O'Boyle DATE:10/08/2015 1 REV:0 -/ 201— ECO: <br /> o R <br />