Laserfiche WebLink
M. 011itoring System certification <br /> UST Monitoring Site Plan <br /> Site Address: ._••_--. Cts, ARNG, 2000 Stimson RD, Stockton <br /> L-1 UST Annular 420 sensor <br /> North � <br /> L-2 UST STP 208 sensor L-8 Annular <br /> L-3 reel UCC 208 sensor probe <br /> L-4 Trans Sump 208 sensor <br /> L-5 AST Annular 420 sensor <br /> _ L-4 Trans Sump <br /> t0KASi', <br /> Vaporless LD 3000 Underground product <br /> Line Leak Detector piping to AST <br /> L-7. STP7O <br /> 15K US <br /> Probe peel UDCAboveground piping <br /> OverspillUnderground productlpiping to aading reel <br /> L-1 Annula _ <br /> Veeder-foot <br /> 10-21-2020 Nato: This Reel UDC; where we <br /> propose to replace a torn environ '/4 conduit <br /> entry boot with a Brave split replair on two conduits <br /> LI <br /> (3—Overfill Alarm . . . ESStap <br /> � <br /> Date.reap waS draw .t y _.l_._. <br /> iistz-uctions <br /> If you already have a diad rarn that shows all required inicrrnlation. you may include it, rather than this page, with your <br /> Monitoring System Certification. ' Oil your site plan, show the general lat'o, t of tanks and piping. Clearly identify <br /> locations of the following t quipn7ertt, if instailed: monitarin system control panel._ sensors monitofing tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; ,mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). in the, space provided. note the date this Site Ilan <br /> was prepared. <br />