My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 11:32:48 AM
Creation date
2/3/2021 10:07:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. 011itoring System certification <br /> UST Monitoring Site Plan <br /> Site Address: ._••_--. Cts, ARNG, 2000 Stimson RD, Stockton <br /> L-1 UST Annular 420 sensor <br /> North � <br /> L-2 UST STP 208 sensor L-8 Annular <br /> L-3 reel UCC 208 sensor probe <br /> L-4 Trans Sump 208 sensor <br /> L-5 AST Annular 420 sensor <br /> _ L-4 Trans Sump <br /> t0KASi', <br /> Vaporless LD 3000 Underground product <br /> Line Leak Detector piping to AST <br /> L-7. STP7O <br /> 15K US <br /> Probe peel UDCAboveground piping <br /> OverspillUnderground productlpiping to aading reel <br /> L-1 Annula _ <br /> Veeder-foot <br /> 10-21-2020 Nato: This Reel UDC; where we <br /> propose to replace a torn environ '/4 conduit <br /> entry boot with a Brave split replair on two conduits <br /> LI <br /> (3—Overfill Alarm . . . ESStap <br /> � <br /> Date.reap waS draw .t y _.l_._. <br /> iistz-uctions <br /> If you already have a diad rarn that shows all required inicrrnlation. you may include it, rather than this page, with your <br /> Monitoring System Certification. ' Oil your site plan, show the general lat'o, t of tanks and piping. Clearly identify <br /> locations of the following t quipn7ertt, if instailed: monitarin system control panel._ sensors monitofing tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; ,mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). in the, space provided. note the date this Site Ilan <br /> was prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.