Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORINT (Page 6 at <br /> XVI. MONITORING SITE <br /> Date site map was prepared _ -- — <br /> 1f you already have a site plan that snows all required information,you may include it,rather than this page, <br /> with your Monitoring System�erlification <br /> Form. The site plan must shote file general layout of tanks and piping and clearly identify locations of the following equipment,if installed f)monitoring <br /> systern control panels;2)in-tank liquid level probes(if used for leak detection);3)devices monitoring tank annular spaces or vault;4)devices monitoring !� <br /> product piping;5)devices monitoring fill piping;B)devices monitoring vent piping;7)devices monitoring vapor recovery piping,8)devices monitoring <br /> ventltransition sumps;9)devices monitoring under-dispenser containment; 10)line leak detectors;and 1 1)devices monitoring any other secondary <br /> containment areas. <br /> I <br /> 1 <br /> i <br /> Stockton AASF Reel UDC <br /> j <br /> 1 <br /> i <br /> Ij <br /> 1 <br /> f <br /> f <br /> f <br /> f <br /> { <br /> 1 <br /> i <br /> f <br /> Location of new Bravo <br /> RF-07401 split entry boots <br /> LEGEND <br /> Bernie Olson <br /> No scale ) <br />