My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:46:10 PM
Creation date
2/3/2021 2:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by L17 Manufacturer Industry Standard Professional Engineer <br /> Test Type E Pressure E Vacuum Hydrostatic <br /> Test Equipment Used: vacuum gauge 0-60" <br /> Tank ID #1 regular#2 su er/s lit tank <br /> Tank Manufacturer Modern Wel in <br /> Tank Capacity 12,000/ 8,000 <br /> Test Start Time 10:50 am <br /> Initial Reading 6" vacuum <br /> Test End Time <br /> Final Reading 6" vacuum <br /> Change in Reading 0 <br /> Pass/Fail Criteria zero loss I <br /> Tightness Test Results k7 Pass r7l Fail L7 Pass M Fail r, Pass L7 Fail L7 Pass T Fail <br /> i 7. PIPE SECONDARY CONTAINMENT TEST <br /> F <br /> Test Method Developed by RR ManufacturerI Industry Standard L7 Professional Engineer <br /> Test Type E Pressure 17 vacuum TL7 Hydrostatic <br /> Test Equipment Used: pressure gauge 0-30 psi <br /> Pipe Run ID ' regular i super diesel <br /> Pipe Manufacturer E Smith Smith Smith <br /> Test Start Time 10:15 am 10:15 am 10:15 am <br /> Initial Reading 5 psi 5 psi 5 psi <br /> Test End Time 11:15 am 11�15 am 11 -15 am <br /> Final Reading5 Psi [ 5 psi 5 psi <br /> Change in Reading 0 <br /> Pass/Fail Criteria zero loss I zero loss zeroloss <br /> Tightness Test Results Pass Fail ' Pass 7 Fail Pass `7 Fail , L Pass _r Fail <br /> Pipe Run ID ! { <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results E Pass C Fail 0 Pass C Fail I Ej Pass L7 Fail rl Pass C Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.