My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:46:10 PM
Creation date
2/3/2021 2:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> Up c,,TEST <br /> Test Method Developed by 0 Manufacturer (�c Industry Standard L7 Professional Engineer <br /> Test Type C Pressure C Vacuum k7 Hydrostatic <br /> Test Equipment Used: Caldwell systems <br /> SumplUDC !D 87 stp sump 91 stp sump dc 1-2 udc 3-4 <br /> Sump Manufacturer unknown unknown S Bravo S Bravo <br /> Sump Depth (inches) 54" 54" 28" <br /> 2811 <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 20" 1 9,1 181, g" <br /> Test Start Time E <br /> 12:35 pm 12:15 pm :. 10:15 am 10:15 am <br /> Initial Reading24" 23" 12" 12" <br /> Test End Time 1:35 DM 1:15 pm 110:45 am 10:45 am <br /> Final Reading 24" 23" 12" 12" <br /> Change in Reading 0 0 0 !0 <br /> Pass/Fail Criteria 2 2 2 2 <br /> Tightness Test Results 0 Pass Fail KI Pass Fail k7 Pass ( Fail (�c `Pass Fail <br /> SumplUDC ID udc 5-6 u udc 9-10 udc 11-12 <br /> Sump Manufacturer S Bravo S Bravo S Bravo S Bravo <br /> Sump Depth (inches) 28" 281, 28" 28" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 8" 8" 8" 8" <br /> Test Start Time 10:1 10:50 am 10:50 am 10:50 am <br /> Initial Reading 12" 12" 12" 12" <br /> Test End Time 10:45 AM 11:20 AM 11:20 AM 11: 20 AM <br /> Fina! Reading 12" 12" 12" 1211 <br /> Change in Reading 0 0 0 _ 0 <br /> Pass/Fail Criteria 1 .2 2 2 .2 <br /> Tightness Test Results Pass T7 Fail M Pass T7 Fail $nPass L7 Fail Pass (! Fail <br /> Additional copies of this page may be attached. <br /> All tests marked 'Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.