Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8, SUMPIUDO TEST (continued) <br /> Test Method Developed by ®' Manufacturer L7 Industry Standard T: Professional Engineer <br /> Test Type M Pressure L7 Vacuum L7 Hydrostatic <br /> Test Equipment Used: <br /> Sump/UDC ID udc 13-14 udc 15-16 udc 17-18a udc 18-19a <br /> Sump Manufacturer S Bravo S Bravo S Bravo <br /> Sump Depth (inches) 2811 2811 28" 2811 <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 811 1811 8" <br /> Test Start Time <br /> 11:30am ji1:30 am 11:30 am 1:00 Pm <br /> Initial Reading 12" 1211 1211 1211 <br /> Test End Time 12:00 m 12:00 pm 12:00 pm 1:30 pm <br /> Final Reading 1211 12" 1211 12" <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 2 2 2 2 <br /> Tightness Test Results 0 Pass R7 Fail F1 Pass r Fail M Pass V Fail Ll Pass 17 Fail <br /> Sump/UDC ID udc 19-20a udc 20-21a udc 21-22a udc <br /> Sump Manufacturer S Bravo S Bravo <br /> Sump Depth (inches) 2811 2811 „ 11 <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 811 811 811 811 <br /> Test Start Time 1:00 m 1:00pm 1:30 pm 1:30 pm <br /> Initial Reading 1211 12' 1211 12' <br /> Test End Time 1:30 m1:30 m 2:00 m 2:00 m <br /> Final Reading 12" 12" 12" 1211 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 2 2 2 <br /> Tightness Test Results IZ Pass Fail Ll Pass Fail Pass 17 Fail Pass L7 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />