My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:46:10 PM
Creation date
2/3/2021 2:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For "In Service" Secondary Containment <br /> Secondary Containment piping systems can be tested after <br /> the line has been installed and in operation for a period of <br /> time. All systems must be shut off before testing. It is rec- <br /> ommended that where possible, the air input valve be in a <br /> different location than the pressure gauge. Please read and <br /> understand all safety instructions and considerations in the <br /> Installation Manual before testing. <br /> a' <br /> Closed System <br /> Test 3" (75 mm) and 4" (100 mm) secondary containment <br /> closed systems with air at pressures not to exceed 10 psig <br /> (0.069 MPa). Pressure should be left on the system for a mini- <br /> mum of one hour. The test pressure should not exceed the <br /> pressure rating of any component in the piping system. <br /> Open System (Gravity Drain) <br /> Test 3-6"(75-100 mm) secondary containment open systems <br /> with air to the equivalent static head test pressure listed in the <br /> table below. The pressure should be left on the system for <br /> a minimum of one hour, or long enough to soap the joints. <br /> The system must be temporarily sealed during testing. Do not <br /> exceed the pressure rating of any component in the piping <br /> system. <br /> Test Press-u-re for Open System <br /> Feet of Head* Test Pressure 7 <br /> 2 1 .0 <br /> 4 2.0 <br /> 6 2.5 <br /> 8 3.0 <br /> 10 4.0 <br /> 12 5.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.