My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:46:10 PM
Creation date
2/3/2021 2:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr(y PEi/RP1200-12 <br /> records or the ATG readout. Prepare a monitoring <br /> fluid solution to add to the interstitial space. S. PIPING SECONDARY <br /> 4.3.6 Steel Tanks. Liquid-filled (hydrostatic) CONTAINMENT INTEGRITY <br /> _ . <br /> tests on steel tanks require the same fluid as the TESTING <br /> monitoring fluid. Contact the manufacturer for <br /> instructions. <br /> 5.1L General. Underground product piping is available <br /> 4.3.7 Fiberglass Tanks. Determine tank sizc with Single and double walls. Double-walled piping pro- <br /> and diameter and apply the appropriate method. vides containment for leaks from primary containment <br /> and must be leak-free to prevent release of product into <br /> 4.3.8 Test Equipment. Test equipment shall the environment. <br /> include: <br /> 5.2 Purpose. This method is used to test the integrity <br /> • monitoring fluid; of piping interstitial space(s). <br /> • stopwatch or other time-measurement device <br /> 5.3 Description of Test. The interstitial space is <br /> capable of measuring a I-second increment; <br /> sealed at the ends and is pressurized with an inert gas. <br /> • tape measure. The pressure is monitored for I hour.If any pressure drop <br /> 4.3.9 Test Procedure. <br /> occurs, the secondary containment fails the test. <br /> 1. Remove any sensor that may be installed in the 5.4 Test Conditions. The primary- pipe may contain <br /> fuel, and dispensing activities may continue during the <br /> tank interstitial space. <br /> test without affecting test results. <br /> 2. Determine and record the groundwater level. <br /> 5.5 Preparation. If the interstitial space contains prod- <br /> 3. Add test liquid to the tank interstitial space uct, ensure that the interstice is open to the atmosphere <br /> bringing the fluid level into the riser (stand- and perform a precision test on the primary piping before - <br /> pipe) to the appropriate level based on the conducting a test on the secondary containment pipincr. <br /> manufacturer's written procedure. <br /> 4. Document the starting level and start time of Termination fittings must be sealed at all piping ternuna- <br /> the test. tions, and test fittings must be accessible to perform the <br /> test. <br /> 5. Start the time-measurement device. 414 <br /> Check with the piping manufacturer regarding testing <br /> 6. Wait the appropriate time according to the procedures and the proper pressure before testing. Test- <br /> manufacturer's test procedure. s <br /> 7. Document the ending level and ending time of <br /> the test. - <br /> 8. Determine and record the groundwater level - - <br /> 9. Remove liquid added to the tank interstitial <br /> space, and restore the liquid level in the tank <br /> interstitial to normal operating condition. <br /> 10.Reinstall the sensor so that it is installed within <br /> manufacturer's specifications. _ <br /> 4.3.10 Pass/Fail Criteria. Compare the data to _ <br /> the manufacturer's pass/fail criteria in Appendix A -- <br /> to determine if the tank has passed the test. . <br /> FIGURE ri. Boots on piping transitions and through <br /> sump walls must be leak-tight when piping secondary <br /> containment integrity testing is performed. __- <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.