Laserfiche WebLink
5 <br /> B-2000 Dispenser Containment <br /> DISPENSER INSTALLATION <br /> 1, Anchor the dispenscr unto the Bravo Box using illi nipple may be required to extend the dispenser riser_ <br /> washers and nuts on the box. IMPORTANT for rigid piping apply a UL classified pipe <br /> sealant for use and handling of gasoline and petroleum <br /> IMPORTANT at this time follon, dispenser installation oils to externally threaded connections. <br /> instructions for proper anchoring and adjustment. 6. Retighten compression nut without over-tightening. Then <br /> retighten the bolts on the boss-mount bracket or the nuts on <br /> ADJUSTING THE PRODUCT SHEAR VALVE U-bolt mounting bracket. NOTE: use provided washers. <br /> 2. When the dispenser is anchored properly,the dispenser inlet 7. Connect electrical and vapor lines to the dispenser as <br /> or pump inlet should be plumb with the product shear valve. required by local code regulations. Always follow electrical <br /> If the product shear valves are positioned correctly,connect and vapor component manufacturers' installation <br /> them with a union. A nipple may be required to extend the instructions. <br /> dispenser riser. 8. Seal all electrical penetrations. The factory-installed <br /> 3. if the valve and inlet are not aligned,determine the distance conduit penetrations should be sealed in the annular space <br /> necessary for the valve to be moved. To adjust the valve between the conduit and the metal tube. Two methods are <br /> lengthwise and/or widthwise, loosen the 3/8"bolts on the recommended: Bravo electrical seal-off ES-1 or UL- <br /> bracket ends and on the bracket inserts (Fig. 6-A). Align approved seal off compound for "cementing" the FEF <br /> valve to dispenser inlet and retighten bolts. (Factory Electrical Fitting). The method used should <br /> 4. To adjust the height of the valve, loosen the B-18-3 comply with local code requirements. <br /> compression nut with a chain wrench, rotating it counter- 9. Clear all debris(pea gravel, dirt,etc)from the inside of the <br /> clockwise. NOTE: it is not necessary to completely containment box and float reservoir(s). Remove float foam <br /> unthread the compression nut. cover. Check if the float chain tension is properly adjusted <br /> and connected to the shear valve and float arm. The amount <br /> Loosen the two nuts on a U-bolt, or three bolts on a boss of fluid or float travel to trigger shut off mechanism is <br /> mounted system. Then adjust the height of the valve. dependent upon the chain tension. IMPORTANT Test the <br /> NOTE: it may be necessary to loosen the compression float system with the valve in the open position by gent/ <br /> gasket before adjusting the valve. To loosen the gasket, raising the float tubing up approximate/ 114"to %". This <br /> raise the product shear valve. should shut the shear valve. See Adjusting the Float <br /> Mechanism (page 7). <br /> IMPORTANT: ifyou have inadtiertentivrotated the bottom 10. Water leak test ONLY FIELD-INSTALLED penetration <br /> nut or applied torque to the bulkhead product f tting, call fittings. To leak-test field penetrations, fill the box with <br /> the Bravo Factory at 800-282-7286. Outside U.S.A. call water two inches above penetrations. After a few minutes, <br /> (323) 888-4133 make a visual inspection from underneath the box. If there <br /> are no leaks,remove the water with a Bravo siphon pump. <br /> 5. Connect dispenser riser pipe to the product shear valve. A 11. Reset the shear valve trip mechanism to the open position. <br /> 6—A Electrical Union 6—B <br /> Electrical Seat-0B <br /> Conduit <br /> 3/8^diem Nipple <br /> Botts <br /> i <br /> ES <br /> VN <br /> Compression <br /> Nut <br /> Bottom Nut <br /> t <br /> i2> I F F 1 <br /> B-19-34 EBS <br /> Fitting Body / <br />