My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
730
>
1600 - Food Program
>
PR0546430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 4:16:59 PM
Creation date
2/4/2021 2:42:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546430
PE
1635
FACILITY_ID
FA0026312
FACILITY_NAME
AMOR MIO #96813L2
STREET_NUMBER
730
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14723003
CURRENT_STATUS
01
SITE_LOCATION
730 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N sJ O A Q U I N Environmental Health Department <br /> —COUNTY— <br /> The EHD must be kept informed of the construction progress. A final inspection must be performed, operating <br /> permit fees paid, and approval to operate granted prior to opening for business. All equipment must be installed <br /> and thorough cleaning completed prior to the final inspection. Inspections must be scheduled at least 48 hours <br /> in advance. Charges for additional inspections, re-inspections and/or consultations may be assessed at the <br /> EHD hourly rate of$152 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with applicable State <br /> laws, and/or city or county ordinance codes, shall be constructed or reconstructed upon request of the EHD. <br /> Inferior workmanship, equipment, or materials will not be accepted for the construction or operation of a food <br /> facility. Any variance from the requirements outlined in this letter will require written approval from the EHD. <br /> Approval of the submitted plans shall become null and void if the work authorized is not commenced within 180 <br /> days from the date of approval, or the work authorized by such plans is abandoned. In order to renew action on <br /> an expired plan approval, the applicant.shall submit fees equal to that of'a new plan review. A copy of the <br /> approved plans shall be available on site at the time of final inspection. <br /> If you have any questions, please contact Stephanie Ramirez, Senior Registered:Environmental Health <br /> Specialist, at (209) 468-9851. <br /> Sincerely, <br /> Jeff Carruesco, REHS, RDI <br /> Program Coordinator <br /> JC <br /> 2of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.