Laserfiche WebLink
NO REVISION do DATE <br /> (E) EXISTING <br /> (N) NEW <br /> SAM SHUT OF VALVE <br /> U.C. UNDER GROUND <br /> W C.O: WALL CLEAN OUT <br /> P.O.C. PONT OF CONNECTION <br /> F.C.O. FLOOR CLEAN OUT <br /> V VENT <br /> CW COLD WATER <br /> VENT To ROOF <br /> V.T.R.(N) WATER HEATER <br /> HW HOT �� <br /> 2"W (N) WATER HEATER (f] <br /> 31'CW HCW HW --- (q WASTE <br /> WASTE <br /> lLqlL!JE1lw <br /> UTL. RM , 1{2» CV I HW a ,._..._.__,,, CW <br /> MP-1 .7- VENT <br /> (E) HW W <br /> > moi/ <br /> I <br /> c � z 0 � <br /> ntV• !1 i r /2"CW L0 <br /> � 2 V r `. Q <br /> cc < <br /> RST+4 Ll �L � z � <br /> fl >- <br /> 'LAV-1 RSTRM t Q <br /> LLJ C.� <br /> ui z Q <br /> 12 CW HW <br /> 1 -- <br /> n <br /> � Z <br /> f�\ l t1 <br /> 0 <br /> Z <br /> m <br /> J <br /> CL <br /> N / WRAPPING IS REWIRED ON ALL UNDER_SLAB OR <br /> LMXRMBALDING SEWERS„ FLOOR SINKS. FLOOR DRAINS. TRAP Pte, WASTE D <br /> AND OTHER FERROUS PIPING. INCLUDING ALL 2INC--CAA7ID CALip m= PIING <br /> AND FITTINGS. CORROSION PROP ECTION / WRAPPING IS RE1QUIRM ON COPPER LLI <br /> WATER PIPING PER C.O.T. MIUI+ICI %L CODE AND THE 2016 CPC SEC. 312.4. ..- <br /> C ROSIN PROTpC'IYON SWILL BE INSPECTED & APPROl @ COVERING. <br /> �., <br /> z <br /> M <br /> 0 <br /> p o <br /> W 100 <br /> < , r <br /> < () co 0 <br /> m Q <br /> pOQa <br /> � 7 <br /> zcy) H- <br /> J <br /> Mounir D. <br /> _gyp <br /> H. Balla <br /> JOB NUMBER <br /> N SHEET <br /> PLUMBING PLAN- WASTE PIPINGP-1�- PLUMBING PLAN- WATER PIPING , 4SCAM . oI` s <br /> i <br />