Laserfiche WebLink
PLUMBING FI X TU R E SCI--I E D U LE Na REVISION & DATE <br /> BRIEDEI�'F TYPE <br /> V CAP <br /> MARK MAKE & MODEL DESCRIPTION REMARKS <br /> couNTER FLASHING��L.Elr1lE <br /> GRA1AT1f--FED VITREOUS CtpNA FLOOR MOUNT@ FLUSH TMA( GAL/ FLUSH. ELONGATED BOtML WITH <br /> WC-1 AMERICAN STANDARD 2898.012 HANDICAP 17 CLOSET I MATCHING 80LT CAPS, tMHITE COLOR. POLISH@ CHROME AC1UATM.1UNMT AND ANSTALLATI 7N SHALL COMPLY WITH ADA AND TI'IL,I: 24. STORM COLLAR WRH <br /> WATER CLOSET SHALL COMPLY W/ U.S EPA WATER SENSE TANK-rWE HM EFFI[�EJJCY TOILET 7CATION DR w aAmD AT TOP <br /> LAV-1 AMERICAN STANDARD 3211.059 LAVATORY VITREOUS CHINA COUM'IIER MOUNIM LAVATORY WITH H.C. (70111 <br /> HANDICAP Il04--11L'1D,P TRAP, WHf 1E COLOR, MAX FLOW RATE Q4 FAUCET, L FAItCET 23f�5,tkfi3, GRID DRAIN & 803-D56a0 TALL P= a SEAMLESS SHEET METAL <br /> - - IST, SHALL COMPLY W/ ASME A 1121&1/CSA 8125.1 FIASHIN (E) METAL ROOFING '' FLASHING do COUSHEET <br /> FLASHING FOR WEATHER SEAL. <br /> LAP-1 KOHLLR K-6!150 SERVICE SINK 22.x. CHINA SERVICE SMNC W/ TRAP At S7fRA1NER. R{1,t GUARD. HOT 8e COLD FAUCET. MAX FLOW RATE SHALL BE 1.75 GPM. (E) METAL ROOFING <br /> GRID STRAINER ASSEMBLY 3 COPPER INLETS ANO INSTACLF./IN AQUATOR. <br /> C-0-T.G. ZURN Z-14060--15 CLEAN OUT TO GRADE <br /> W.C.O. TURN Z-1445-4 WALL CLEAN OUT WALL CLEAN OUT W/ S.& COVER <br /> VENT PIPE " <br /> F.C.O. ZURN Z-1400 FLOOR CLEAN X>AST 8 <br /> FLOOR C1�J1N OUT w/ ss cDvER BL.OG ROOFING FRAMING PER <br /> 5/8" SHEET ROCK ARCHITECTURAL PLANS z <br /> 1" <br /> ui >_ <br /> AIR SPACE <br /> DOUBLE WALL FLUE ALL FLASHING SHALL BE PER <br /> LATEST SMACNA STANDARDSuJ <br /> Q <br /> z O z co <br /> NOTE: VERIFY ALL PLUMBING FIXTURE COLORS WITH OWNER. OPTIONAL; PROVIDE EQUAL CAPACITY UNIT. FLUE DUCT DETAIL SCALE o � � <br /> ,� $ SCALE _ O 0) <br /> N.T.S. VENT THRU ROOF DETAIL _ N A �" �`- <br /> 2•o-1•.-O" 4 .,.,J <br /> THERMAL EXPANSION TANK REQUIRED <br /> WHEN BUILDING SUPPLY PRESSURE Z �,._, <br /> IS GREATER THIN RELIEF VALVE F <br /> PLUMBING N D TE S: PRESSURE SETTING AS PER C.P.C. CONCRETE SURFACE OR FLOOR CL <br /> HOT WATER SUPPLY � �C' �B•3 COVERING AS REQUIRED W Q � (� <br /> 1. DRAWINGS INDICATE DIAGRAMMATICALLY THE ARRANGEMENT OF PRINCIPLE APPARATUS, PIPING AND FIXTURE CONNECTION SIZE TO BUILDING I z <br /> OTHER MATERIAL FOLLOW DRAWINGS AS CLOSELY AS POSSIBLE, IN ORDER TO ACHIEVE A NEAT MAKE--UP CLEANOUT COVER +� _O < <br /> TO ACHIEVE ARRANGEMENT OF PIPING. AND EQUIPMENT WHILE STILL OVERCOMING OBSERVATION, FIXTURE SYM OUTLET TRAP VENT �� WATER HOT WA R W <br /> . PIPES HW,CW,DRAIN) UNDER LAVATORY FOR THE PHYSICALLY HANDICAPPED SHALL BE INSULATED BRANCH TLET BRANdi <br /> SHUTOFF VALVE & FLEX CONN. TYP, CSK SCREW O w Iti <br /> 3. ALL PLUMBING VENTS SHALL TERMINATE 120 FROM ANY VERTICAL„ WALL AND 10' FROM ANY OUTSIDE AIR INTAKE. WATER CLOSET (TANIQ WC 4" 4" 3/4" 3/4r CLEANOUT PW <br /> c <br /> 4. DRAIN. WASTE. AND VENT PIPE SHALL BE ABS SCH 40. _ - TEMPERATURE AND LAVATORY SINK LAV 20 2` 1-1/20 1-1/2 1/20 1/20 1/2" 1/2" PRESSURE RELIEF VALVE FINISHED FLOOR <br /> 5. WATER PIPES SHALL BE SCHEDULE 40 GALVANIZED STEEL, ASTM A120, OR TYPE L COPPER. nOOR <br /> ASTM 1388. PIPE BELOW GRADE SHALL HAVE PROTECTIVE COATING OF POLYETHYLENE. DRAIN 20 A 30 FD 2+.4" 20.3" 20.30 2* _ (2) 3/8"Dlkx 3 <br /> 6. GAS PIPE SHALL BE SCHEDULE 40 BLACK STEEL, ASTM A120. GAS PIPING BELOW GROUND SMALL <br /> BOLTS - ANCHOR 3/4` CU. DRAIN TO Q <br /> HAVE PROTECTIVE COATING WRAPPED MATERIAL BY MANUFACTURE. GAS - � MINE. {YYP. OF 2) OUTSIDE OF BUILDING <br /> PIPING SHALL BE BARRIED MINIMUM DEPTH OF 2A•" BELOW GROUND. ABOVE GROUND AT e <br /> EQUIPMENT HORIZONTAL GAS PIPING SHALL BE SUPPORTED PER TABLE 12-3, SEE BELOW, TURNED DOWN 13" A.F.F. <br /> ° <br /> 7. ALL EQUIPMENT SERVED MATH GAS SHALL HAVE A SHUT-OFF VALVE AND FLEXIBLE CONNECTION AT UNIT. STRAP WH 10 roL�N.V. <br /> 8. ROUTE 3/4" GALVANIZED OR COPPER PIPE DISCHARGE OF P & T RELIEF VALVES FROM WATER TD PREVENT <br /> r� <br /> cn <br /> HEATER TO EXTERIOR OF BUILDING. STUB PIPING +6' A80VE FINISH GRADE AND ELBOW DOWN. EATI�aI ML�VEMENT, CAULKING FERRULE -- <br /> 9• ROUTE 3/4" CU PIPE FOR CONDENSATE DRAIN FROM FAN C04L TO QUTStDE OF BLDG. W/ ELBOW ON. FUTURE WATER SUPPLY FIXTURE UNITS Q <br /> ALO s" A.F.F. 1/2" HOSE BW }-- <br /> 11- ALL IDE Bi13B SHALL HAVE BACKFLOW PREVIrNTOR. MARK DESCRIPTION FIXTURE TOTAL N0. OF PROVIDE sTRhpPING AT POINT LLT <br /> 11. PROVIDE MIN. OF 1 4' SLOPE AT ALL WASTE PIPING AT 3' PIPE AND SMALLER.PROVIDE 1/130/FOOT QUANTnY UNIT FIXTURE ORT LEG WITHIN THE UPPER 1 3 AND d <br /> SLOPE AT WASTE III 4'�AND LARGER. <br /> LOWER 13 OF QE FLOW <br /> 12. WATER CLOSET AND ASSOCIATED FLUSHOMETER VALVES SHALL USE NO MORE THAN WC:-1 WMIITER CLOSET ! 2,� Z.5 WATER HEATER VERT. ©ITS, .�. <br /> 1.28 GAL. PER FLUSH & SHALL MEET PERFORMANCE STANDARD ESTAOUSHED 13Y 714E AMERICAN --. <br /> NATIONAL STANDARDS INSTITUTE STANDARD A712-19-2, 14&5 CODE SECTION 17921.3(b)- UIV-1 THE LOWER STjWpING SHALL <br /> 1.0 BE MIN. OF 4 ABOVE THE <br /> 13. ALL WATER PIPING IS IN ATTIC SPACE U.O.N. FOR UNDERGROUND PIPING. CONTROLS, PER UBC 5,0,7 <br /> 14. ALL PLUMBING SHALL MEET 2016 C.P-C. MP-1 MOP SINK 1 <br /> 15-PRIOR TO COMMENCEMENT OF 1 2,0 2.0 00 <br /> WORIC, THE CONTRCTOR SHALL VERIFY THE EXACT LOCATION, �/�� `" <br /> ELEVATIONS, AND CHARACTERISTICS OF ALL UTILITIES AND PIPING OF *VCH IS TO CONNECT r■AT f ER DETAIL SCALE <br /> AND SHALT. IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR PROBLEM& FLOOR <br /> CLEANOUT A� <br /> 16.TRAP FOR ALL LAVATORIES AND SINKS SHALL TRAP STRAIGHT BACK TO WALL WITH ALL, N.T.S. L DETAIL 3 <br /> REQUIRED OFSETS WITHIN 'ME WALL 1 w <br /> 17.ALL PLUMBING WORK SHALL BE INSTALLED TO AVOID INTERFERENCE WITH E.ECTRICArL, <br /> MECHANICAL EQUIPMENT AND STRUCTURAL FRAMING. 18' S(?. IRON FERRULE ►Ill PIPE HA <br /> N ER W,H ULE <br /> .THE RC HI SHALL COORDINATE THE LOCATION N ALL CEILING ACCESS PANELS WITH CONCRETE PAD BRASS COUNTERSUNK PIPIT: SIX NANM.POE BOLT spmm- <br /> THE ARCHITECTURAL REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING PLAN. FINISH GRADE CLEANOUT PWG <br /> 19.ALL CLEANOUTS SHALL BE INSTALLED WHERE EASILY ACCESSIBLE. THE CONTRACTOR SHALL 40 <br /> COORDINATE ALL CLEANOUT LOCATIONS WITH ALL EQUIPMENT. CABINETS, M PRIOR "1 3 3 1 <br /> TO INSTALLATION. ° THRU �1 1 1 Q <br /> 2C3.ALL VALVES. UNiOUNS, ETC. TO 8E SAME SIZE AS PIPE UNLESS INDICATED TOTAL FIXTURE UNITS S, ° ` 3• 1 t 10' QC <br /> OTHERWISE ON DRAWINGS. D <br /> 21.BEFORE FABRICATION OR INSTALLATION PLUMBING CONTRCATOR SHALL VERIFY EXACT a <br /> LOCATIONS OF ALL MECHANICAL EQUIPMENT AND EQUIPMENT PROVIDED UNDER ANOTHER ti _ s ROOF PURLJN <br /> SPECIFICATIONS. EXACT ROUGH-IN 'LOCATIONS AND d <br /> WITH WORK OF OTHER CONSULTANTS AND EQUIPMENT DOORS DRAB GS. COORDINATID <br /> 22fF MACHINE SAWCU'IT1NG OF SLAB IS RE RED FOR PIPING TO BE INSTALLED BL1AN► FLOOR, 2"x2 7c1/4" - 6" LONG STEEL <br /> VERIFY EXISTING SLAB CONDITION IN FlEI.D . N0.3 Ri_INF BARS �� ANGLE " <br /> 23,ALL VALVES TRAP PRIMER. W//��TER H�I�MF-R ARItL:S OR OTFIp� Ep�JIPMENT SHOWN ON WITH {23 1/2 f x3 L BOLTS <br /> WALLS OR ABOVE NON-AQP E CE?LINGS SHALL INSTALLID 01 IND ANf ACCESS PANEL M �H WXY TO STRUCTURAL FRAMING <br /> 24.ALL PLUMBING FIXTURES AND EjQ%UgRMENT SHALL ElE CERTIFIED BY THE STA Y <br /> COMMISSION TO GCXM4PLY Wr71i EFFl(wENCY STANDARDS PER SEC:710N 2--5314ATHE CLAMPING COLLAR FITTING <br /> TITLE-24 REGULATIONS. <br /> 25.ALL HOT WATER PIPING SHALL BE INSULATED WITH 1" THICK MANVILLE OMICROLOCK` w/ No--HUB BANp;S <br /> 850-APT SNAP ON FIBERGLASS INSULATION_ _ -� i <br /> 26.PIPING THROUGH FIRE RATED WALL SHALL BE INSTALLED PER U.L FIRE RESISTANCE SYSTEM HANGER ROD SEE <br /> SCHEDULE FOR SIZE <br /> NO. WL1001. REFER TO ARCHITECTC URAL DRAWINGS FOR WALL LOCATION. <br /> 27-MMAL.S AND ASSOCIATED FLUSMMETER VALVES %jAL,L USE No MORE THAN 0.3 QAL. I PER FLUSH & SHALL MEET PERFORMANCE STANDARD ESTABUSHED BY THE AMERICAN NA710MAL ADJUSTABLE BAND HANGER T' <br /> STANDARDS INSTITUTE STANDARD A112-19.2 H&S CODE SEC71ON y1�792'1.3(b) � SEE SPECS FOR TYPE <br /> 28-CONTRACTOR TO BID ANDLLVER POINT OF COONNNECCTTIIGON�TO UTIUUTIF ES PRIOOR IX"OON&UCTM. <br /> 29-ALL EQUIPMENT SHALL BE LATERALY SUPPORTED IN ALL DIRECTIONS TO RESIST 20X OF THE W <br /> EQUIPMENT OPERATING WgGHT. <br /> 30-PROVIDE THRUST !SLICKS FOR ALL;NEW U.G. UTrUTIES. CONCRETE PAD TO BE FLUSH WITH <br /> 31-PIPING PASSING THROUGH CONCRETE FLOORS SHALL BE ADEQUATELY PRO7EC7M AG�AMST FINISH GRADE IN PAYED AREAS, WROUGHT STEEL, CLEVIS �` <br /> BREAKAGE PER CPC SEC. 312. F1AI 'Es R SEE SPECS FOR TYPE Y <br /> 32.AL L PRESSURED WATER PIPING BELOW FLOOR SHALL BE TYPE "L` SOFT ANEAL@ COPPER Q <br /> TUBING WITH NO FITTING BELOW SLAB. <br /> 31S ��//��// n SCALE <br /> GUIDELIDED <br /> NES <br /> PIPING SHALL BE PROVIDED WITH ALTERAL SWAY BRACING PER S.M.A.C.N.A. 2`••AY Cj.O.T.G, <br /> C,YJIDEUNES FOR SEISMIC coNSTRAIwTs. � PIPE HANGER, DETAIL <br /> SCALE � <br /> 34-ALL DOMESTIC WATER VALVES UP M AND INCLUDING 2" IN SIZE SHALL BE MADE OF BRASS OR N.T.S. r� <br /> OTHER APPROVED MATERIALS. N.T.S. G Z <br /> EACH GATE VALVE SHALL BE FULL-WAY TYPE WITH WORKMIG PARTS OF NOIR-CORROSIVE MATERIAL, <br /> PER CPC SEC. 605.1 <br /> 35-THE (E) MAIN WATER SERVICE HAS REDUCED PRESSURE BACK FLOW PREVENTER. O <br /> MAY EXTEND AS <br /> 36. ALL FLOOR DRAINS SHALL HAVE TRAP PRIMER AS PER PLAN (TP TRAP PRIMER) WASTE OR YENS <br /> a to <br /> FINISHED FLOOR CLEANOUT PLUG o° <br /> FOR WALL CONST. � � � � r�o <br /> REF ARCH. DWGS. <br /> p COUNTERSUNK ~.J Q 'q. M1 <br /> o 0 po C.I. CLEANOUT TEE <br /> EW < U OO •a <br /> WATERPROOF ° m �a ' � <br /> FL ASN LED INTO <br /> p p o FLOOR EINE14* im C] <br /> CLAMPING COLLAR POUSHED S.S. Zr <br /> tQ CLAMPING COLLAR ACCESS COVER z fit. <br /> A ,d ° 1 /80 BEND AND E D CLEANOUT ~ r ~ <br /> WASTE UNE DATE <br /> LENGTH To SUIT 01-06-19 <br /> FLOOR DRAIN WITH P TRAPRWM 1MI�LAQF,R <br /> P WASTE LINE M o L.ouI n i Ir D. <br /> AIZ <br /> 1/Z` TRAP PRIMER (TP-1) <br /> H. Balla <br /> ♦. ,� Jba NUMBER <br /> NOTES & SCHEDULESSHEET <br /> SOLE 9 FLOOR DRAIN DETAILP-2 <br /> NSC& 5 WALL CLEANOUT DETAIL SCALE <br /> OF SHEETS <br />