My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2024 11:48:47 AM
Creation date
2/16/2021 2:01:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0505867
PE
2361 - UST FACILITY
FACILITY_ID
FA0007059
FACILITY_NAME
H&S Energy Products, LLC #3035
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
RD
City
Lathrop
Zip
95330
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
192 Lathrop RD Lathrop 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer C✓ Industry Standard C Professional Engineer <br /> Test Type 0 Pressure 0 Vacuum ❑Q Hydrostatic <br /> Test Equipment Used: <br /> Tank ID Gasoline-87 Gasoline-91 E85 Diesel <br /> Tank Manufacturer Modern Modern Modern Modern <br /> Tank Capacity 20,000 20,000 20,000 12,000 <br /> Test Start Time 10:28 9:52 10:08 9:33 <br /> Initial Reading 7 7 7 7 <br /> Test End Time 12:28 11:52 12:08 10:33 <br /> Final Reading 7 7 7 7 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results 0✓ Pass 0 Fail ® Pass C Fail ® Pass 0 Fail ❑x Pass [ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by El Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 0 Vacuum C Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID Gasoline-87 Gasoline -91 E85 Diesel <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 9:33 9:46 9:40 9:42 <br /> Initial Reading 5 5 5 5 <br /> Test End Time 10:33 10:46 10:40 10:42 <br /> Final Reading 5 5 5 5 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results M Pass C Fail E Pass C Fail Pass IC Fail ❑x Pass C Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass 0 Fail 0 Pass C Fail I 0 Pass C Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.