My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2024 11:48:47 AM
Creation date
2/16/2021 2:01:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0505867
PE
2361 - UST FACILITY
FACILITY_ID
FA0007059
FACILITY_NAME
H&S Energy Products, LLC #3035
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
RD
City
Lathrop
Zip
95330
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
192 Lathrop RD Lathrop 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: <br /> Sump/UDC ID 87 STP 91 STP E85 STP Diesel STP <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Unknown (FRP) Unknown (FRP) <br /> Sump Depth (inches) 81 82 82 82 <br /> Sump Bottom to Top of 48 48 68 26 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:11 11:08 11:40 11:40 <br /> Initial Reading 1.9184 2.4132 1.7863 2.5994 <br /> Test End Time 10:27 11:23 11:55 11:55 <br /> Final Reading 1.9176 2.4122 1.7859 2.5995 <br /> Change in Reading -.0008 -.001 -.0004 .0001 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail © Pass © Fail © Pass ❑� Fail <br /> Sump/UDC ID UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8 <br /> Sump Manufacturer Bravo (FRP) Bravo (FRP) Bravo (FRP) Bravo (FRP) <br /> Sump Depth (inches) 30 30 30 30 <br /> Sump Bottom to Top of 12 10 12 10 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 1:36 1:36 1:12 1:59 <br /> Initial Reading 4.4562 3.6994 5.3996 4.3986 <br /> Test End Time 1:51 1:51 1:28 2:15 <br /> Final Reading 4.4562 3.7004 5.4004 4.3985 <br /> Change in Reading 0.0 .001 .0008 -.0001 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results 0 Pass 0 Fail © Pass 0 Fail 0 Pass © FailIM Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.