Laserfiche WebLink
A J OA U I Environmental Health Department <br /> COUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> TRACY SHELL* 3725 N TRACY BLVD, TRACY January 27, 2021 <br /> Single-Walled Non-Pressurized Piping <br /> 404 CCR 2643(,),2661(f) Failure to conduct 0.1 gph test on single-walled gravity piping biennially or post repair(pre-1984) ❑V ❑R ❑COS <br /> Other Violations <br /> 2010 1 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 107 HSC 25292.2; CCR 2711(a)(11) Failure to submit and maintain complete and current financial responsibility <br /> documents. <br /> OBSERVATION: Current financial responsibility documents were not found on site. <br /> REGULATION GUIDANCE: A copy of current financial responsibility documents are required to be maintained on <br /> site. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br /> copy on site. <br /> This is a minor violation. <br /> 122 CCR 2712(f) Failure to implement corrections and submit written response within 30 days of receiving the report. <br /> OBSERVATION: An inspection was last done on 01/02/2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 01/31/2020. This information was received on 04/28/2020, three months late resulting in a non-compliant status for <br /> this facility. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a repeat violation, Class ll. <br /> 205 CCR 2712(1) Failure to have current UST Monitoring Plan readily accessible at the facility. <br /> OBSERVATION: An approved copy of the monitoring plans were not available for inspection. <br /> REGULATION GUIDANCE: A copy of these plans shall be accessible on site at all times. <br /> CORRECTIVE ACTION: Immediately locate and retain a copy on site. <br /> This is a minor violation. <br /> FA0003780 PR0231417 SCO01 01/27/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 4 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />