Laserfiche WebLink
Pastor Matt Linder. <br /> May 5,2003 <br /> Page 2 <br /> Major System Components <br /> i <br /> System Design Flow: 1875 gp.di . <br /> Primary Tank Size: 2,000 gallons.with solids grinder pump package and alarm. <br /> Circulation Tank Size: 3,000 (optional use of 2;000 and 1,200 gal tank) <br /> Two AdvanTex AX-20 Pods <br /> One pumping package for AdvanTex <br /> One splitter valve <br /> Our understanding is the"next step"in the process is for EHD to assess the capabilities of the OSI <br /> AdvanTex system based on the literature OSI provided to diem and their experiences with'enginecred <br /> waste water treatment systems. EHD will require the nitrate loading addendum and this letter to review. <br /> Should EHD approve the use of'the system,they will most Iikely require a maintenance contract,yearly <br /> permit to operate, and possibly some kind of'effluent or ground-water quality monitoring. These <br /> I requirements are typical for.similar projects. <br /> r <br /> j A copy of this letter,the nitrate loading study addendum,a servicerequest form, and a check for$178 <br /> should be submitted to EHD,design proposal to their office. -The nitrate loading study addendum <br /> discusses the impacts to ground water using an OSI AdvanTex system. Since the use of the system will <br /> need,to be approval by EHD, a system drawing and disposal field layout is premature at this.time. <br /> However, a parts list and cost estimate generated by OSI is-attached to this letter. The final system <br /> drawings will be provided to you and EHD upon your request..At-that time; we understand there will be <br /> a$890 review fee by EHD to evaluate the plans- <br /> Our professional services were performed,our findings obtained, and our conclusions proposed in <br /> accordance with generally accepted engineering principles and practices. This warranty is in lieu of all <br /> other warranties either expressed or implied. Test findings and statements of professional opinion do <br /> not constitute a guarantee or warranty, expressed or implied. <br /> Best Regards, <br /> NEIL O. ANDERSON&ASSOC-, INC. <br /> D . Welch,M.Sj Senior Geologist Garre S.H.Hubbart, M.Sc.,Project Manager <br /> CEG-2151, CHG-653 Civil Engineer No. 59010 <br /> attachments/ OSI component list and part cost estimate <br /> OQ�pF ESS/C) <br /> ti F <br /> yv? <br /> � `p F <br /> z <br /> pE4f <br /> No. 2151`0� d Exp.6103 . r os <br /> CERTIFIED a ,� <br /> ENGINEERING <br /> GEOLOGIST ` , fJFOAtIF� 'fso�`P <br /> 9�oF CAS-�F°�� - - <br /> - <br />