Laserfiche WebLink
nsta I I ati o n G u i d e: Commercial AdvanTex' Systems <br /> ISP p�rfarrxrt =€::: .° <br /> Step la: Before excavating and leveling the pad for the : <br /> AdvanTex pods,refer to the engineering plans and verify that <br /> there are no obstructions on the construction site that might , " <br /> prevent installation of the AdvanTex Treatment System. Since <br /> the filtrate return lines have a slope requirement,it is best to <br /> make sure the inlet, outlet, ventilation lines, and slopes all <br /> 7TH' <br /> match the plans. `s <br /> NOTE: The outlet coupling for the filtrate return line is <br /> permanently installed in one corner of the AdvanTex pod. <br /> i <br /> Step lb: Excavate to the depths determined above for proper <br /> elevations. Make sure the floor of the pad is free of debris, <br /> especially rocks and other sharp objects. If the bottom of the <br /> excavation is uneven or rocky, lay down a 3"bed of sand or <br /> pea gravel to create an even, smooth surface. ' <br /> Ste lc: Outline the excavation area(with chalk,Paint string, <br /> etc.)for all of the AdvanTex pods. Make the pad for each <br /> AdvanTex pod approximately 12" wider and longer than the <br /> pod's footprint,and maintain a minimum of 24"between pods s <br /> d ., . <br /> to allow for maintenance access. , <br /> NOTE: Pods are tapered, so the top of the pod(lid) is larger <br /> than the bottom of the pod. ' " <br /> 4 a <br /> HIM-ATX-AX-2 ®2003 Orenco Systems"Inc. <br /> Rev 1.0,ZW <br /> 5 <br /> �I <br /> I <br />