My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0033424_ENG DESIGNED PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
4200 – Liquid Waste Program
>
SR0033424_ENG DESIGNED PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 5:01:01 PM
Creation date
2/17/2021 4:48:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
ENG DESIGNED PLAN
RECORD_ID
SR0033424
PE
4202
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
Zip
95336
ENTERED_DATE
4/9/2003 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n n <br /> Installation Guide: Commercial AdvanTex® Systems <br /> i <br /> MOP 2� <br /> Step 2a: Since each AX100 pod weighs approximately <br /> 1,650 lbs. dry, it is important to use properly sized lifting <br /> equipment to unload the pods from the shipping truck, Drive <br /> the flatbed as close to the staging area as possible before <br /> unloading,to minimize travel with the suspended pods. <br /> WARNING: Loading and unloading AX100 pods from a <br /> flatbed truck can be dangerous, especially when the pods are <br /> double-stacked Please use the proper lifting equipment. <br /> Step 2b: Each AX100 pod ships with four polypropylene <br /> straps for lifting. Hook a chain or cable(minimum 12.5'long) <br /> through the straps and attach to a forklift or crane across the <br /> width of the pod,not along its len h. (Lifting the pod with <br /> cables stretched lengthwise may cause the pod to buckle, <br /> thus damaging the lids.)Lift the pod slowly until the <br /> cables/chains are taut. This will allow you to make sure all <br /> the hooks are properly attached to the polypropylene straps. <br /> When you are satisfied that the lifting attachments are secure, <br /> remove the pod from the truck and offload it onto the con- <br /> struction pad or staging area. Do not extend the lift or crane <br /> too far horizontally or the pod may tip the lifting machinery. <br /> i <br /> k Step 2c: Using the lift or crane, suspend the pod just slightly <br /> above the construction pad surface so a worker on the ground <br /> =ems. can maneuver the pod into place. Make sure when you place <br /> the pods that the outlets align according to the engineering <br /> plan. Once you have the pod over the location you want, <br /> slowly lower it so that it sets into place without shifting.The <br /> pod, although heavy, can be pushed a few inches by two or <br /> three individuals if necessary. <br /> Step 2d: Remove the cables/chains and pull the polypropy- <br /> lene straps down so they hang below the lids. <br /> j NOTE: AdvanTex AX100 pods have been designed for <br /> 1 installation in areas that are free of water. If your installation <br /> requires placement in a high-water area, contact your engineer <br /> for antiflotation options.For tank antiflotation measures, consult <br /> the tank manufacturer <br /> F <br /> a 0 2003 Orenco Systems*Inc. NIM-ATX-AX-2 <br /> Rev 1.0.2/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.