Laserfiche WebLink
Installation Guide: Commercial AdvanTex" Systems <br /> teP: Epe firern�a�`=;e.p�; :gm: }��_ <br /> ® Make sure these items have been completed before scheduling <br /> an Orenco representative for system start-up: <br /> • All plumbing connections have been completed. <br /> - All electrical connections have been completed. <br /> ry <br /> ° • A phone line has been connected to the control panet <br /> All tanks have been successfully tested for watertightness. <br /> • All recirculation tanks are 75%full. <br /> An Orenco representative will perform the system start-up, <br /> going through an exhaustive checklist to guarantee your com- <br /> mercial AdvanTex Treatment System is in working order. In <br /> addition to logging project and system information,the Orenco <br /> representative will verify proper installation of components <br /> including, but not limited to, the following checklist items: <br /> Primary Treatment System <br /> • Septic Tanks <br /> • Septic Tank Pumping Equipment <br /> • Septic Tank Controls <br /> • Grease Tanks <br /> E Secondary Treatment System <br /> • Recirculation Tanks <br /> • Recirculation Tank Pumping Equipment <br /> • Recirculation Tank Controls <br /> • Distributing Valve Assembly <br /> • Ventilation Fan System <br /> • AdvanTex Filter Operation <br /> Dispersal System <br /> • Dosing Tank <br /> • Dosing Tank Pumping Equipment <br /> • Dosing Tank Controls <br /> • Distribution Valve Assembly <br /> The Orenco representative will inspect the AdvanTex System <br />` for proper installation,test all components, document initial <br />` performance values, and verify that all system components are <br /> functioning properly. <br /> The engineer, contractor, electrician, and operator should all be <br /> present at system start-up. <br /> ©2003 Orenco Systems*Inc. NIM-ATX-AX-2 <br /> Rev 1.0,2103 <br />