Laserfiche WebLink
n <br /> Installation Guide: <br /> Commercial AdvanTW Systems <br /> A. BY <br /> <<<E_. �' '4, <br /> ....:� <br /> j Step 12a: Backfill the excavation. Follow the tank manufac- " ` <br /> turer's guidelines for backfilling the tanks. <br /> Step 12b: Backfill and compact around each AdvanTex pod <br /> 8 1, <br /> in maximum 12"lifts.Native material is acceptable if it has no g=` <br /> large or sharp rocks that may damage the pod walls. If native <br /> material is not usable,backfill with sand or pea gravel. Slope <br /> the ground away from the pods to prevent surface water from <br /> ponding on or around them. �_ <br /> NOTE: Since AX100 pods are suitable for exposure to UV, <br /> backfilling might not be required. Refer to your engineering '' <br /> plans for details. ' ` <br /> �E <br /> i <br /> E <br /> i <br /> NIM-ATX-AX-2 ®2003 Orencs Systems'Inc. <br /> Rev 4A.2103 <br /> i <br />